摘要:本文结合施工实践系统的阐述了JSH40/140双导梁步履式架桥机及其架设梁板的施工技术。
关键词:架桥机、施工
1概述:JSH40/140双导梁步履式架桥机适用于各种桥梁(直桥、斜桥、曲线桥)的简支梁架设,能够满足桥线制梁、梁厂制梁等工况,可携边梁一次横移到位,实现全断面机械化移、落梁。
该架桥机采用三角桁架作主要承载受力构件单元,单元间采用销轴连接,配置自力纵横双向走行装置,导梁纵向步履运行装置和吊重行车,用以实现安全过孔,吊放梁体的三维运动。
该机由主机和机动运梁车两大部分组成。经中铁三局集团邯郸工程机械制造公司设计,制造的新一代架桥机。
JSH40/140双导梁步履式架桥机因采用三角桁架结构重量轻,采用主导梁前端设置引导梁过孔安全可靠,采用柱体步履导梁纵行不铺轨道,且桥面荷载合理,采用支点游动支撑适应不同跨径桥梁安装,采用铺设全断面横移轨道达到架梁一次到位,自动化程度高,采用日立E-64HR可编程序控制器自动化程度高,控制灵活可靠,增加了作业安全性能,采用拼装式易于拆装、运输,便于转移工地,经济性好等特点,;广泛用于流动作业工程施工,尤其适宜水桥、高桥墩、宽桥面吊梁施工。
2主要性能参数:
2.1主机部分
On JSH40/140 double guide beam walking Erector slab construction methods and installation
Wang Dengwu
(Sichuan Road & Bridge Group Co., Ltd. Sichuan based branch exchange)
Abstract: This paper described the construction practice of the system JSH40/140 walking beam dual-guided bridging machine and set up slab construction techniques.
Keywords: bridge machines, construction
1 Overview: JSH40/140 double guide beam walking bridging machine suitable for all kinds of bridges (straight bridge, skew bridge, curved bridge) of Simply Supported Beams, to meet the bridge-wire beam, beam factory working conditions of beam, etc., portability of a sliding side beams in place to achieve full face mechanized moved off the beam.
The triangular truss bridge machine for the main load bearing member unit, units used between the pin connections, configure vertical and horizontal two-way self-running gear, guided walking beam running gear and the vertical hoist road to achieve security through hole, dipping beam body three-dimensional motion.
Machine by the host and motor vehicle transport beam composed of two parts. The China Railway Group III Bureau of Handan Construction Machinery Manufacturing Company designs, manufactures a new generation of bridge machine.
JSH40/140 double guide beam walking Erector triangular truss structure by using light weight, set by the leading front-end beam guidance beam through-hole reliability using the cylinder walking beam longitudinal guide track is not paved, and deck load is reasonable, with Active Support for different fulcrum bridge with the installation, by laying track to traverse the whole cross section Beam once in place, high degree of automation, Hitachi E-64HR PLC high degree of automation, flexible and reliable control and increased operational safety performance, using assembled easy disassembly, transport, easy to transfer site, and good economic characteristics; widely used in mobile operations and construction, especially suitable for water bridge, high piers, wide Deck Beams.
Two main performance parameters:
2.1 host part
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160530次
- Autocad2013 64位32位破解版附带注册机
- 148311次
- 天正建筑8.5破解版
- 144045次
- autocad2012 64位32位 破解版(附注册
- 137474次
- 天正建筑8.2破解版
- 123394次
- autocad2010免费下载(简体中文版)
- 97140次
- CAD2008注册机及使用说明
- 80809次
- 免费农村房屋设计图
- 73728次
- cad图集大全
- 56763次
- 11g101图集全套下载
- 45305次
- 用钢管桩和贝雷片做现浇箱梁施工支架施
- 433次
- 桥梁钻孔灌注桩施工现场旁站监理检测记
- 428次
- 工程机械台班费汇编
- 418次
- 高速铁路论文集
- 402次
- 公路水下水泥混凝土水中抗分离剂应用技
- 402次
- 预应力混凝土组合箱梁桥损伤识别方法研
- 402次
- 桥梁博士小工具
- 401次
- 最新路桥专业交通部的试验检测工程师复
- 401次
- 300-350kmh双线隧道内轮廓-2011-01-10
- 401次
- 桥梁主梁节段模型三分力系数风洞试验研
- 401次