一、 工程概况:
白沙关——婺源高速公路C7标段由黑龙江农垦建工路桥有限公司负责承建。工程位置在K27+500——K32+900,本标段路线全长5.4km。其中戴家高架桥中心桩号为K27+714,起点桩号为K27+530.5,终点桩号为K27+897.5,大桥全长367m,宽26m,横断面组成为0.5+11.5+0.5+1.0+0.5+11.5+0.5,河床至桥面高达36m。该桥上部结构为40m预应力钢筋混凝土T型梁,先简支后连续。全桥计9孔,分二联,四孔一联,五孔一联,计108片梁。下部结构钻孔桩基础,圆柱式墩,肋板桥台。全桥44根桩基,其中Φ2.5m12根,Φ2.2m20根,Φ1.6m12根,圆柱32根,盖梁8个。
二、 T梁预制标准:
梁长:无伸缩缝 内
Wearing a T beam prefabricated home construction program Viaduct
1, Project Overview:
Baishaguan - Wuyuan Lot C7 highway construction work by the Road & Bridge Co., Ltd. Heilongjiang Land Reclamation is responsible for construction. Project location K27 +500--K32 +900, the tenders full line of 5.4km. Stake wear them at home centers for the viaduct K27 +714, from Stake for the K27 +530.5, end Stake for the K27 +897.5, bridge length 367m, width 26m, cross-sectional composition of +0.5 +1.0 +0.5 + 0.5 +11.5 11.5 +0.5, up river to the bridge 36m. For the 40m bridge superstructure of prestressed concrete T-beams, simply supported continuous. Total full-bridge 9 hole, divided into two joint, four-hole of a joint, a joint five-hole, 108 meter beam. Substructure bored pile foundation, cylindrical piers, ribs Itabashi station. Full-bridge 44 piles, which Φ2.5m12 root, Φ2.2m20 root, Φ1.6m12 root, cylinder 32, cap beam 8.
2, T beam prefabricated standard:
Beam length: no expansion joints within
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160780次
- Autocad2013 64位32位破解版附带注册机
- 148385次
- 天正建筑8.5破解版
- 144084次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123424次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73852次
- cad图集大全
- 56934次
- 11g101图集全套下载
- 45655次
- 沉井施工方案
- 1654次
- 石方爆破施工方案
- 1531次
- 土方回填施工方案
- 1174次
- 水泥稳定级配碎石基层施工方案
- 983次
- 沉管灌注桩施工方案
- 919次
- 石拱桥工程施工方案
- 773次
- 路基排水工程施工方案
- 732次
- 珠江新城隧道施工方案
- 663次
- 给水管道、消防管道和排风管道安装工程
- 561次
- SPJ30-300型架桥机施工方案图(CAD)
- 525次