预应力混凝土先张法空心板梁施工技术方案

一、工程概况
HN-E2标段起点位于镇江市丹阳互通式立交东侧,桩号为EKl82+000,沿途经过丹阳市开发区、练湖农场、河阳镇,终点桩号为EK196+180,全长14.18km。本标段有特大桥1座(京杭运河特大桥),中桥1座,涵洞34道,通道21道,分离式立交桥11座(其中支线上跨桥5座),互通式立交桥2座;路基土石方挖方383335立方,填方726444立方,湿喷桩软基处理长度为308717.9延米,预应力薄壁管桩27307.5延米。
二、工程规模
本标段采用了L=10m、L=16m和L=20m三种跨径的预应力砼先张法空心板,L=10m跨径的预制梁高为0.4m; L=16m跨径的预制梁高为0.7m; L=20m跨径的预制梁高为0.85m。L=10m的梁共有64片,L=16m的梁共有16片,L=20m的梁共有64片。
先张法 边板 中板 高度(cm)
 数量 底板宽(cm) 数量 底板宽(cm)
10m 内边板 外边板 99.5 48 99 40
 8 8   
16m 内边板 外边板 99.5 12 99 70
 2 2   
20m 内边板 外边板 99.5 48 99 85
 8 8   
三、施工准备
1、材料
(1)、水泥:江苏联合P.O.42.
Pre-tensioned prestressed concrete hollow slab construction technology programs

First, project survey
HN-E2 is located in Zhenjiang City, Danyang Lot from interchange east of Stake to EKl82 +000, Danyang Development Zone, along the way through, training Lake Farm, River Township, end Stake for the EK196 +180, full 14.18km . The tenders are Bridge 1 (Beijing-Hangzhou Canal Bridge), in a bridge, culvert 34, channel 21, separated overpass 11 (where the branch line across the bridge 5), 2 Interchanges; Foundation 383,335 cubic meters of earth excavation, fill 726,444 cubic meters, wet spray Soft pile length 308,717.9 running meters, prestressed thin-walled pipe 27,307.5 running meters.
Second, size of the project
The tenders with a L = 10m, L = 16m and L = 20m of three span prestressed concrete pre-tensioned hollow plate, L = 10m span of the precast beam height is 0.4m; L = 16m span prefabricated beam height is 0.7m; L = 20m span of the precast beam height of 0.85m. L = 10m the beam a total of 64, L = 16m the beam a total of 16, L = 20m the beam a total of 64.
Pre-tensioned sides of plate height (cm)
 Number of floor width (cm) the number of floor width (cm)
10m outside the board within the side plates 99.5 489 940
 88
16m outside the board within the side plates 99.5 129 970
 22
20m outside the board within the side plates 99.5 489 985
 88
Third, construction preparation
1, material
(1), cement: Jiangsu Joint P.O.42.
 