沥青砼中面层施工方案

一、计划安排
根据试验段总结的施工工艺,按照业主经理部、总监办、驻地办的要求,我项目部沥青砼中面层大面积施工用的工、料、机组成已协调一致,具备开工条件,计划()年()月()日进行施工。
二、要求
我项目部将严格按照试验段所总结的施工工艺(包括原材料质量控制、下承层的清扫、沥青混合料的拌合、运输、摊铺、碾压、养护等工艺)指导施工。在以后大面积施工中,我们将不断总结经验、不断完善工艺,以保证沥青砼中面层的施工质量。
三、配合比组成设计
1、1#拌和机生产配合比
①生产配合比组成为:
1#热料仓:2#热料仓:3#热料仓:4#热料仓:矿粉
=17 :39 :10 :30 :4
②最佳油石比选定为:4.2%
2、2#拌和机生产配合比
①生产配合比组成为:
1#热料仓:2#热料仓:3#热料仓:4#热料仓:矿粉
=25 :30 :7 :33 :5
②最佳油石比选定为:4.2%
四、管理机构及人员、机械、试验仪器配备
1、管理机构见附图1。
2、主要人员见附表1、主要机械、试验、质检设备见附表2
五、施工工艺
一)工艺流程
Surface layer of asphalt concrete in the construction plan

1, schedule
According to the test summary section of the construction process, in accordance with the owner manager of the Department, Director, Office of the Resident Office's request, I project in the Department of asphalt concrete surface with a large construction work, material, machine component has coordinated, with start conditions, planning ( ) year () month () day construction.
Second, demands
I project department will be in strict accordance with test section of the summary of construction technology (including raw materials, quality control, the next layer of cleaning contractors, asphalt mixture mixing, transport, paving, rolling and curing process) and construction. Construction of large area in the future, we will continue to sum up experience and improve the process to ensure that surface layer of asphalt concrete in construction quality.
Third, the composition of the design mix
1,1 # mixing machine production mix
① the production mix composed of:
1 # hot silo: silo 2 #: 3 # Hot hopper: 4 # hot hopper: Mineral Powder
= 17: 39: 10: 30: 4
② selected as the best aggregate ratio: 4.2%
2,2 # mixing machine production mix
① the production mix composed of:
1 # hot silo: silo 2 #: 3 # Hot hopper: 4 # hot hopper: Mineral Powder
= 25: 30: 7: 33: 5
② selected as the best aggregate ratio: 4.2%
Fourth, managers and personnel, machinery, test equipment with
1, regulatory agencies, see Figure 1.
2, key personnel, see Table 1, the main machinery, testing, quality control equipment, see table 2
5, construction technology
A) process
 