洣江大道二期工程施工方案.doc
一、项目概述
洣江大道二期工程位于洣江北岸,西起衡东大桥桥头处,连接洣江大道一期,沿洣江向东与文明东路平交后,一直向东延伸连接到衡大高速连接线上,本标段全长1600米,是一条城市Ⅲ级主干道,路幅宽度36米。本道路是城区的一条重要的东西主干道,建成后它就可和原唯一的一条东西向主干道交通东路一起形成城区道路交通网络,它的建设对缓解城区交通拥堵具有重要意义;并可大大改善城市环境、提升城市品位、有利于促进招商引资、加快城镇发展。
根据《中国地震参数区划图GB18306-2001》,全线地震基本烈度均小于Ⅵ度。故本路线所设构造物仅做简单抗震设防。
沿线水系较发达,河流降水量充沛,雨量多集中在4~8月,河水位受降水量影响明显。
本区属亚热带季风性湿润气候,气候温和,四季分明,雨水充沛,春湿多雨;夏秋多旱,严寒期短,暑热期长。常年平均气温16.2℃~17.7℃,极端最高气温40.5℃,极端最低气温-7.9℃,一年中以7~8月最热,12月~次年2月最冷,有霜冻和降雪,年降水量1325.3~1395.1mm,集中在3~8月,年蒸发量为1452mm,全年无霜期231~282天。气候对施工计划有影响的主要是雨季。
路线所在地区交通比较发达,地方乡村道路密集、交通便利;电网密布,电力资源充足;有程控电话,可直接与世界各地通讯联系。
二、技术标准
全线按城市Ⅲ级公路标准设计,主要技术指标如下:
1、设计行车速度 40km/h
2、路幅宽度 36m
3、路面宽度 15m
4、路面面层结构类型 厚24cmC30混凝土
5、最小圆曲线半径 400m
6、最大圆曲线半径 1000m
7、最小纵坡 0%
8、最大纵坡 1.433%
I. Project Overview
Mijiang Boulevard Phase II project is located Mijiang north, west, value-East Bridge Bridge Department, the connection Mijiang Avenue 1, along with the civilized Mi Xiang-Dong Jiang Road, the Cross and has been extended eastward to connect to the large scale high-speed connection line, The tenders length 1600 m, is a city of grade Ⅲ main road, road width of 36 meters. This road is an important thing city main road, it can be completed and the original only one thing to the Main Road East with the formation of urban road network, its construction to alleviate urban traffic congestion is important; and can greatly improve the urban environment, improve urban quality and help to promote investment and speed up urban development.
According to "China Earthquake Zoning Map of GB18306-2001", full range of basic earthquake intensity is less than Ⅵ degree. Therefore, this route is only set to do a simple earthquake-proof structures.
More developed along the river system, rivers abundant rainfall, rainfall mostly in 4 to 8 months, the water bit by precipitation was obvious.
This area belongs to humid subtropical monsoon climate, mild climate, four distinct seasons and plenty of rain and wet rainy spring; summer and more drought, cold and short, and long summer heat. Annual average temperature of 16.2 ℃ ~ 17.7 ℃, extreme maximum temperature 40.5 ℃, extreme minimum temperature of -7.9 ℃, the year to 7 August the hottest, in December to next February the coldest, with frost and snow, the annual precipitation volume 1325.3 ~ 1395.1mm, concentrated in the 3 August, the annual evaporation is 1452mm, annual frost-free period 231 ~ 282 days. Impact of climate on the major construction program is the rainy season.
Route traffic more developed area, the local rural road with convenient traffic; power clouds sufficient power resources; a program-controlled telephone, direct communication links with the rest of the world.
Second, technical standards
Ⅲ grade highway across the board by the city standard designs, the main technical indicators are as follows:
A designed speed of 40km / h
2, road width 36m
3, the road width of 15m
4 types of road surface structure of concrete thick 24cmC30
5, the minimum curve radius 400m
6, the maximum of the curve radius 1000m
7, the minimum longitudinal slope 0%
8, the maximum vertical grade 1.433%