市政管道工程施工组织方案.doc
第一章 施工组织方案
1.1 施工测量
本工程施工测量的主要任务是:施工控制网的建立(包括全线主控制网的复测与施工控制网点的加密),施工细部结构以及形体的几何尺寸,倾角、线型等精密定位,本工程涉及到工程测量与安装测量两方面的技术问题,测量技术含量高,施工测量精度要求高,因此我项目部将本工程施工测量列为首要工序,重点管理,要求测量部门技术超前,科学管理,及时总结,精益求精,以高质量、高效率地完成本工程施工测量任务。
1.1.1测量质量技术管理
(1)测量硬件设施配置:本工程中,将投入1台高精度的全站仪,2台高精度的精密水准仪,2台J2经纬仪以及相关测量设备。
(2)测量人员配备:在本工程中我单位将调派富有市政道路施工测量经验的测量工程师1名和测量工2名。
(3)测量技术管理:在本工程施工中拟建严格的测量校核、复核、审核技术管理制度,除在测量部门内部实行此制度进行自检外,项目部实行项目总工程师、专职质检员、测量技术主管三级参加的技术复核制度,单项技术干部参加并负责单项的测量技术复核工作,本工程测量技术管理流程见下图。
Chapter Organization Plan
1.1 Construction Survey
Construction Survey of the main tasks are: Construction Control Network (including the full range of master control network and construction of complex test control network encryption), construction detail structure and shape of the geometric dimensions, angle, line, such as precision positioning, the project Surveying involves measuring and installation of two technical problems, high levels of measurement, construction measurement of high precision, so I project the Department will measure the construction process as a primary focus on management, ahead of required measurement sector technology, scientific management, timely summary of excellence, with high quality, high efficiency measurement tasks in this construction.
1.1.1 Measurement Quality and Technology Management
(1) measurement hardware configuration: this project will be put into a high precision of the total station, 2 sets of high accuracy, precision leveling, 2 J2 theodolite and related measuring equipment.
(2) measuring staffing: In this project I units will be deployed to the rich experience of the municipal road construction survey measurement and measurement engineers a working 2.
(3) Measurement and Management: In this strict construction of the proposed measurement check, review, audit technology management system, in addition to measuring the implementation of this system within the department to conduct self-inspection, the project chief engineer of the Ministry to implement the project, full-time quality control member of measurement technology to participate in the technical review of tertiary charge system, participation and individual technical cadres responsible for reviewing the work of individual measurement techniques, the project management process measurement shown below.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160780次
- Autocad2013 64位32位破解版附带注册机
- 148385次
- 天正建筑8.5破解版
- 144084次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123424次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73852次
- cad图集大全
- 56934次
- 11g101图集全套下载
- 45655次
- 沉井施工方案
- 1654次
- 石方爆破施工方案
- 1531次
- 土方回填施工方案
- 1174次
- 水泥稳定级配碎石基层施工方案
- 983次
- 沉管灌注桩施工方案
- 919次
- 石拱桥工程施工方案
- 773次
- 路基排水工程施工方案
- 732次
- 珠江新城隧道施工方案
- 663次
- 给水管道、消防管道和排风管道安装工程
- 561次
- SPJ30-300型架桥机施工方案图(CAD)
- 525次