通浒路雨污水管施工方案

一、 设计概况
本工程为苏州新区通浒路一期工程,全长2705.4米。
本工程排水体制为雨污水分流制。
根据苏州新区北片污水方案,通浒路一期:建林路以西的污水管由西向东铺设,管径d800、d1000、途中以过河管、倒虹管形式过河,建林路以东的污水管由东往系西铺设,管径d600:两路污水管汇合后往南铺设d1200管,沉管过浒光河,进建林路污水管泵站,本工程到河北岸为止。污水管位于道路北侧公交车道下,管中心距道路中心线16.5米、20米,沿途预留DN400、d 600、d800的污水支管。
W3-W4,W12-W15的污水干管及d600、d800污水支管、d1200污水横穿管位于亚粘土夹亚砂土层,管道埋设较深,须采用井点降水。
为确保位于砂土地基的污水管道质量对W30-W32、W33-W45 d1000污水干管及d1200污水干管进行压密注浆。
雨水管按照就近入河的原则,分别排入路南侧浒光河及9+581处的小河内。雨水管二根,分别位于道路南北两侧公交车道下,管中心距人行道侧石1.5米,雨水管管径为DN400、d600、d800 、 d1000 d1200,沿途预留DN400、d 600、d1000雨水支管。
二、 污水管工程施工技术方案
1、测量放样
根据图纸和给定控制点,在现场测
Tong Yu Hu Road sewer construction program

A design overview
This works through Hu Road, Suzhou New District, a project length of 2705.4 meters.
This works for the rain water drainage system streaming.
Suzhou New District North tablets sewage under the program, through Hu Road, 1: Forest Road to the west of the construction of sewers laid from west to east, diameter d800, d1000, on the way to river management, the form of inverted siphon crossing the river, built east of Forest Road sewage pipes laid from east to west line, diameter of d600: Two after convergence south sewer pipe laying d1200, Shen Hu-ray tube over the river into the construction of Forest Road sewer pump station, the project to the north of the river so far. Sewer in the road north of bus lanes, the control center of the center line of 16.5 meters from the road, 20 meters, along the reserved DN400, d 600, d800 sewage branch.
W3-W4, W12-W15 trunk sewers and d600, d800 sewage branch, d1200 sewage pipe located across the sub-folder of Sandy clay layer, pipe laying and deeper, to adopt the well point dewatering.
To ensure that the sewage pipes in the sand foundation of quality on the W30-W32, W33-W45 d1000 d1200 trunk sewers and trunk sewers for compaction grouting.
Rainwater into the river in accordance with the principles of proximity, respectively, into the light River Road, south of Hu and 9 +581 stream within the Department. Rain water pipe 2, respectively, north and south sides of bus lanes in the road, the control center 1.5 m from the sidewalk side of the stone, rainwater pipe diameter DN400, d600, d800, d1000 d1200, along reserved DN400, d 600, d1000 rain branch.
Second, sewer construction technology programs
1, Survey setting
According to the drawings and given control points, measured in the field
 