漳州战备大桥主桥施工方案.doc
漳州战备大桥主桥施工方案
1、 工程概况
(略)
2、 下部施工
主桥7#墩为水中墩,为解决基础施工及上部结构的材料运输,建议设立从9#—7#墩的施工栈桥,利用栈桥设立钻孔平台,进行主桥钻孔桩及承台的施工。,
该桥为低桩承台,可采用钢套箱围堰进行施工。即先在工厂进行分块预制,通过栈桥运至墩位拼装,通过平台上的起重设备进行下沉。钢套箱围堰可采用单双壁组合式,下沉方法可采用有水吸泥下沉,然后灌注封底混凝土,施工承台。
3、 上部施工
3、1 0#块施工
0#块的施工为支架施工,其临时墩柱作为主桥悬臂施工的临时墩,因此,必须具有足够的强度和刚度,建议采用钢管混凝土墩柱,下端支撑在承台或封底混凝土上。
3、2 悬臂段的施工
悬臂段采用挂蓝进行施工。挂蓝采用菱形挂蓝,在4片腹板处设4片主桁架,以4米的节段进行浇注。后端锚固于腹板的竖向预应力筋上。
3、3 塔柱的施工
在施工悬臂段的同时,进行塔柱的施工。塔柱施工时注意预埋穿索平台的预埋件。
4、 4斜拉索的施工
Zhangzhou program readiness Bridge Construction
1, Project Overview
(Abbreviated)
2, lower construction
7 pier for the main bridge piers in water, the basis for the settlement construction and the upper structure of the material transport, recommended the establishment of 9 # -7 # pier from the construction trestle, trestle used to establish drilling platform, the main bridge bored piles and pile cap construction. ,
Bridge for low pile caps, can be used for construction of steel boxed cofferdam. The first block in the factory prefabricated, transported through the trestle bridge to the piers is assembled, the platform on the lifting equipment to sink. Steel cofferdam can use one set of double-wall combination, sink method can be used sink water suction, and then perfusion of concrete cover, pile cap construction.
3, the upper construction
3,1 0 # block construction
0 # block construction for the stand construction, the temporary pier as a temporary main bridge pier cantilever construction, therefore, must have sufficient strength and stiffness, recommended steel concrete pier supporting the bottom or back cover of concrete in the cap on.
3,2 Cantilever Construction
Cantilever construction carried out by hanging blue. Hanging Basket Hanging Basket with diamond, set in the four webs of the main truss 4 to 4 meters segments were cast. Back-end anchor in the vertical prestressed reinforcement on the web.
3,3 tower construction
Cantilever construction, while for tower construction. Note tower construction embedded embedded parts to wear cable platform.
4, 4 cable construction
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160780次
- Autocad2013 64位32位破解版附带注册机
- 148385次
- 天正建筑8.5破解版
- 144084次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123424次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73852次
- cad图集大全
- 56934次
- 11g101图集全套下载
- 45655次
- 沉井施工方案
- 1654次
- 石方爆破施工方案
- 1531次
- 土方回填施工方案
- 1174次
- 水泥稳定级配碎石基层施工方案
- 983次
- 沉管灌注桩施工方案
- 919次
- 石拱桥工程施工方案
- 773次
- 路基排水工程施工方案
- 732次
- 珠江新城隧道施工方案
- 663次
- 给水管道、消防管道和排风管道安装工程
- 561次
- SPJ30-300型架桥机施工方案图(CAD)
- 525次