您现在的位置:主页 > 路桥隧道 > 施工组织设计 > >>

李家沟中桥工程实施性施工组织设计.doc

资料评价:
★★★☆☆
更新时间:
2010-07-15
下载要求:
注册会员
文档大小:
0.05 MB
授权方式:
共享资料
上传会员:
zly1911
文档类型:
.doc
所属栏目:
施工组织设计
需要金币:
1
资料语言:
简体中文
资料简介:免费注册 本站会员可得金币,更多赚积分方法请查看:积分说明 下载地址

李家沟中桥左线施工里程为DzK45+480.99~DzK45+592.91,桥全长111.92米,李家沟中桥右线施工里程为DzK45+488.25~DzK45+602.02,桥全长113.77米,本桥为排洪兼立交而设,跨越李家沟河,桥位于R=2500 m的圆曲线及缓和曲线上。孔跨式样为:4孔24m。T形桥台,桥墩采用圆端形桥墩,基础采用φ100钻孔桩基础,钢护筒倒用。对既有线采用吊轨梁及钢管桩进行防护。
Lijiagou in the left lane of the bridge construction mileage DzK45 +480.99 ~ DzK45 +592.91, bridge length 111.92 m, the right line Lijiagou Construction of bridge mileage DzK45 +488.25 ~ DzK45 +602.02, bridge length 113.77 meters, the bridge designed for the discharge and interchange across the Li Gou, Bridge at R = 2500 m of the circular curve and the relaxation curve. Span style is: 4 hole 24m. T-shaped pier, pier-side with round-shaped piers, foundation pile drilling with φ100, steel casing down with. Hanging on the existing railway track beams and steel pile protection.

帮助 收藏 报错 评论>>
李家沟中桥工程实施性施工组织设计下载
点击此处下载