李家沟中桥工程实施性施工组织设计.doc

更新时间: 2024-02-29
下载权限: 免费会员
文件大小: 0.05 MB
文件类型: .doc
浏览次数:
上传会员: zly1911
所属栏目: 施工组织设计
进入下载页
资料简介

李家沟中桥左线施工里程为DzK45+480.99~DzK45+592.91,桥全长111.92米,李家沟中桥右线施工里程为DzK45+488.25~DzK45+602.02,桥全长113.77米,本桥为排洪兼立交而设,跨越李家沟河,桥位于R=2500 m的圆曲线及缓和曲线上。孔跨式样为:4孔24m。T形桥台,桥墩采用圆端形桥墩,基础采用φ100钻孔桩基础,钢护筒倒用。对既有线采用吊轨梁及钢管桩进行防护。
Lijiagou in the left lane of the bridge construction mileage DzK45 +480.99 ~ DzK45 +592.91, bridge length 111.92 m, the right line Lijiagou Construction of bridge mileage DzK45 +488.25 ~ DzK45 +602.02, bridge length 113.77 meters, the bridge designed for the discharge and interchange across the Li Gou, Bridge at R = 2500 m of the circular curve and the relaxation curve. Span style is: 4 hole 24m. T-shaped pier, pier-side with round-shaped piers, foundation pile drilling with φ100, steel casing down with. Hanging on the existing railway track beams and steel pile protection.