某某物流场区道路-桥梁-堆场-大门-围墙工程施工组织设计.doc
(1)道路、堆场做法:土基压实、级配碎石、6%水泥稳定石屑、中粗砂垫砂层、预制混凝土联锁块。
(2)两座小桥跨径20m,桥宽16.5m,基础采用钻孔灌注桩,预应力空心板预制安装工艺施工。
(3)消防游泳池及泵房、变电所侯工楼均为一层框架结构、基础采用打入式PC-φ400×95-A型管桩。
(4)门卫、水表房一层框架结构,采用天然基础,基础埋置在压实填土层,建筑面积21.1m2,标牌构筑物6.4m2。
(1) road, yard approach: compaction of subgrade, graded gravel, 6% cement stabilized stone chips, sand in the sand pad, precast concrete interlocking blocks.
(2) The two bridges span 20m, bridge width 16.5m, based on use of bored piles, precast prestressed hollow slab construction installation process.
(3) Fire Swimming Pool and pumping stations, substations Hou work floor are level frame structure, based on type used to enter the PC-φ400 × 95-A-type pipe.