某三级公路施工组织设计.doc
XX至XX三级公路全长25.22km,起于XX市郊的XXX(XXX国道桩号:K1654+160),西与XXX区的XX路相接,向东沿着XXX国道经XX、XX、XX、分水坳、岩门溪、XX、八家、黄板桥过XX县XXX乡集镇,经黄山冲至冲里接老路(XXX国道桩号K1627+180)。1986年,交通部、中国人民解放军后勤部将该项目列入XX市“八五”计划建设的6条国防公路之一。近年来,随着国民经济的发展,该路段的交通流量迅速增加,原来公路已经不能适应目前交通量的需要,特别是不能适应部队大型技术装备机动性的要求。因此修建XX公路,具有重要的政治、军事、经济等意义。我们所投标段是第三合同段,桩号为K11+500~K25+220,全长13.72km。
XX to XX 3 road full 25.22km, starting from the outskirts XX XXX (XXX State Road Stake: K1654 +160), West and XXX XX road connecting area, east along State Highway XXX through XX, XX, XX , Au watershed, river rock door, XX, 8, yellow Itabashi over XX XXX rural county town, by the impulse to impulse in Huangshan take the old road (XXX State Road Stake K1627 +180). In 1986, the Ministry of Communications, the PLA logistics department to include this item XX City "on August 5," plans to build one of the six national defense highway. In recent years, with the development of national economy, the rapid increase in road traffic, the original road has been unable to meet the needs of current traffic, especially large-scale technical equipment can not meet the military requirements of mobility. Therefore the construction of roads XX has important political, military and economic significance. Tender is the third paragraph of our contract segment, Stake to K11 +500 ~ K25 +220, length 13.72km.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160511次
- Autocad2013 64位32位破解版附带注册机
- 148307次
- 天正建筑8.5破解版
- 144041次
- autocad2012 64位32位 破解版(附注册
- 137474次
- 天正建筑8.2破解版
- 123392次
- autocad2010免费下载(简体中文版)
- 97140次
- CAD2008注册机及使用说明
- 80806次
- 免费农村房屋设计图
- 73715次
- cad图集大全
- 56755次
- 11g101图集全套下载
- 45281次
- 室外400米标准田径运动场(内含一片标
- 1088次
- 中国铁路萧山站道岔施工专项方案
- 754次
- 庄河市新华路延伸改造工程施工组织设计
- 625次
- 高速公路桥梁施工组织设计
- 545次
- 重庆市轻轨较新线一期工程临江门至曾家
- 535次
- 中铁十二局联合体石太铁路客运专线Z8标
- 528次
- 重庆***长江大桥施工组织设计
- 524次
- 重庆市轻轨较新线施工组织方案
- 521次
- 永漳公路漳平段E标段工程施工组织设计
- 469次
- 镇胜高速第20合同段冬季施工方案
- 460次