高速公路隧道施工方案1.doc
一、《××高速公路××隧道工程招标文件(第6B 合同段)》。
二、招标文件提供的设计图、工程量清单等有关资料。
三、国家、交通部现行设计规范、施工规范、验收标准及有关文件。
四、招标期间招标单位与投标单位所有来往的函件及补遗资料。
五、我集团公司对施工现场实地勘察、调查资料。
六、我集团公司积累的成熟技术、科技成果、施工工艺方法及同类工程的施工经验。
七、我集团公司可调用到本合同段的各类资源。
1, "× × × × highway tunnel project tender documents (6B Contract Section)."
Second, provided the tender documents drawings, bills of quantities and other relevant information.
Third, the state, the Ministry of Communications current design specifications, construction specifications, acceptance criteria and related documents.
Fourth, during the tender bidding and bidding units of correspondence and all residual data.
5, Group I site investigation on the construction site, survey data.
6, Group I gained a mature technology, scientific and technological achievements, construction techniques, methods and experience of similar works.
7, Group I used variable types of resources section of this contract.