广州地铁三号线广州东站地处瘦狗岭南麓,地势略呈北高南低,地面高程为13.74~21.13m,北面有广园路,中部为铁路站场,南面为广州东站大片站房建筑。广州东站折返线大部分位于瘦狗岭下,其余部分位于广园东路下方。所处的地形起伏较大,地面高程为19.91 ~105m。广园东路及广园东路以南为山前冲积平原地貌为主,瘦狗岭地段为山地。广园东路上的地面和高架桥上交通繁忙。
广州东站主要包括广州东站及站后折返线暗挖隧道工程。站后折返线暗挖隧道下穿部分瘦狗岭地段、广园东路、广园高架桥等,起点里程为Y(Z)DK0+036.0,终点里程为Y(Z)DK0+336.676,总长为300.676m。广州东站暗挖隧道地表主要为火车东站站区,起点里程为YDK0+336.676,终点里程为Y(Z)DK0+605.182,总长268.51m。车站及折返线隧道防水等级分别为一级和二级。
Guangzhou East Railway Station of Guangzhou Metro Line is located Shougouling Mountain, the terrain is slightly north to south, the ground elevation is 13.74 ~ 21.13m, Canton Road, the north, central railway station, south of a large station in Guangzhou East Railway Station Housing construction. Guangzhou East Railway Station of steam in the thin dog Heights and most of the rest at the bottom of Guangyuan Road. Undulating terrain in which large, ground elevation is 19.91 ~ 105m. Canton Park Road and Canton Road East south of the piedmont alluvial plain landscape dominated Shougouling lot for the mountain. Guangyuan Road East, on the ground and elevated heavy traffic.
Guangzhou East Railway Station in Guangzhou East Station and the main station reentrant line of bored tunnel. Station of steam tunnels beneath the excavated part of Shougouling lot, Guangyuan Road East, Canton Park viaduct, starting mileage for the Y (Z) DK0 +036.0, end mileage Y (Z) DK0 +336.676, a total length of 300.676 m. Guangzhou East Railway Station bored tunnel surface mainly East Railway Station area, starting mileage YDK0 +336.676, end mileage for the Y (Z) DK0 +605.182, length 268.51m. Stations and water level of steam tunnels were one and two.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160511次
- Autocad2013 64位32位破解版附带注册机
- 148307次
- 天正建筑8.5破解版
- 144041次
- autocad2012 64位32位 破解版(附注册
- 137474次
- 天正建筑8.2破解版
- 123392次
- autocad2010免费下载(简体中文版)
- 97140次
- CAD2008注册机及使用说明
- 80806次
- 免费农村房屋设计图
- 73715次
- cad图集大全
- 56755次
- 11g101图集全套下载
- 45281次
- 室外400米标准田径运动场(内含一片标
- 1088次
- 中国铁路萧山站道岔施工专项方案
- 754次
- 庄河市新华路延伸改造工程施工组织设计
- 625次
- 高速公路桥梁施工组织设计
- 545次
- 重庆市轻轨较新线一期工程临江门至曾家
- 535次
- 中铁十二局联合体石太铁路客运专线Z8标
- 528次
- 重庆***长江大桥施工组织设计
- 524次
- 重庆市轻轨较新线施工组织方案
- 521次
- 永漳公路漳平段E标段工程施工组织设计
- 469次
- 镇胜高速第20合同段冬季施工方案
- 460次