建虎网 节省时间成本,让工作学习变得更高效!www.jianhuw.com

新建铁路重庆至怀化线土建工程施工方案.doc

更新时间: 2024-03-02
下载权限: 免费会员
文件大小: 0.19 MB
文件类型: .doc
浏览次数:
上传会员: zly1911
所属栏目: 施工组织设计
进入下载页
资料简介

新建铁路重庆至怀化线土建工程第X标段(DK363+073-DK381+000)全长26.055km范围内的改移道路、改河改沟、砍树挖树根、路基、桥涵、隧道、轨道(不含铺轨、铺岔、线路加强沉落整修)、房屋(不含电气化生产房屋及其附属工程)、其他运营生产设备及建筑物(不含站区建筑绿化工程)、大型临时设施、土建工程引起的过渡工程。不包括路基及隧道岩溶压浆整治工程。

New railway line in Chongqing to Huaihua X Civil Works Lot (DK363 +073- DK381 +000) within the full 26.055km road diversion, change river changed ditch, cutting trees dug roots, subgrade, bridges, tunnels, rail (excluding track-laying and laying turnout, line enhancing sink repair), housing (excluding housing and ancillary works electric production), other operating production equipment and buildings (excluding station building greening project area), large-scale temporary installations, civil works project due to the transition project. Does not include foundation training works and tunnel grouting Karst.

下载地址

前往下载