隧道注浆加固工程施工组织设计方案.doc
北京大学站进线电力沟工程位于北京市海淀区成府路中段,东起铁路东侧家具店,西至东升乡乡政府路口,全长约500米。本工程电力沟为2.00×2.05m暗挖隧道。初衬200mm,二衬200mm,初衬和二衬之间为SBC120聚乙烯丙纶复合防水卷材。
Peking University Station into the ditch line of power engineering in the middle of Beijing Chengfu Road, east of the east railway furniture store, west junction Dongsheng township government, total length 500 meters. This project is 2.00 × 2.05m Power ditch excavated tunnel. Lining 200mm, the second lining 200mm, lining between the lining and two for the SBC120 polyethylene polypropylene fiber composite waterproofing membrane.