机电设备安全技术规程岩土.doc
1、机械操作,要束紧袖口,女工发辫要挽入帽内。
2、机械和动力机的机座必须稳固。转动的危险部位要安设防护装置。
3、工作前必须检查机械、仪表、工具等,确认完好方准使用。
4、电气设备和线路必须绝缘良好,电线不得与金属物绑在一起;各种电动机具必须按规定接零接地,并设
置单一开关;遇有临时停电或停工休息时,必须拉闸加锁。
5、施工机械和电气设备不得带病运转和超负荷作业。发现不正常情况应停机检查,不得在运转中修理。
6、电气、仪表、管道和设备试运转,应严格按照单项安全技术措施进行。运转时不准擦洗和修理,严禁将
头手伸入机械行程范围内。
7、在架空输电线路下面工作应停电。不能停电时,应有隔离防护措施。起重机不得在架空输电线路下面工
作,通过架空输电线路时应将起重臂落下。在架空输电线路一侧工作时,不论在任何情况下,起重臂、钢丝
绳或重物等与架空输电线路的最近距离不小于下表规定:
输电线路电压 l千伏以下、 1-20千伏、 35-110千伏 154千
1, machine operation, to tighten cuff, women in braids to pull into the cap.
2, mechanical and power machine of the base must be solid. The risk of rotating parts to install protective devices.
3, before work to check the machinery, instruments, tools, etc., are allowed to be used to confirm intact.
4, electrical equipment and wiring must be insulated well and not with the metal wires tied together; all kinds of motors required to be connected with ground zero, and let
Purchase a single switch; the event of power outages or downtime to rest, to wind up its lock.
5, construction machinery and electrical equipment operation and overload operation may not sick. Found to be not normally be down to check, not in operation in the repair.
6, electrical, instrumentation, piping and equipment commissioning, should be strictly in accordance with individual security technology measures. Running are not allowed to wash and repair, is strictly prohibited
First hand into mechanical travel range.
7, the overhead transmission lines should be the following power cuts. Can not be a power failure, protective measures should be isolated. Crane shall not work below overhead transmission lines
For, by overhead transmission lines should be boom down. Overhead transmission line side of the work, whether in any case, the boom, steel wire
Rope or heavy objects such as overhead transmission lines with not less than the minimum distance requirements in the following table:
L kV transmission line voltage is below the 1-20 kV, 35-110 kV 154 1000
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160793次
- Autocad2013 64位32位破解版附带注册机
- 148387次
- 天正建筑8.5破解版
- 144091次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123426次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73859次
- cad图集大全
- 56942次
- 11g101图集全套下载
- 45673次
- 可溶性泥土中的管桩地基抗曲率不稳定的
- 392次
- 基坑支护安全检查评分表
- 380次
- 岩土工程安全监测手册
- 374次
- 基坑开挖中的安全监测及事故防治措施—
- 343次
- 04施工现场设施安全设计计算手册-地基
- 333次
- 防止基坑土方坍塌的安全技术措施
- 332次
- 基坑支护工程安全专项方案
- 306次
- 02施工现场设施安全设计计算手册-降水
- 302次
- 广州南沙开发区工程沉管灌注桩安全技术
- 297次
- 竖井开挖安全措施及堵井处理预案
- 296次