土方工程施工安全技术交底示例岩土.doc
建筑工程的土方工程主要为场地平整、基坑(槽)、路基及一些特殊建筑物基础的开挖、回填和压实。土方工程施工中最容易出现滑坡和塌方事故。
主要预防措施有:
施工前应做好必要的地质、水文和地下管道的调查工作,制定出相应的土方开挖方案。
排除地表水、地下水,防止水冲刷、浸流产生滑坡或塌方。
挖土应从上而下进行,严禁掏洞挖土施工。
严格按照土质和深度情况进行放坡,放坡系数按施工
Mainly for construction site preparation earthworks, excavation (slot), subgrade, and some special building foundation excavation, backfill and compaction. Earthwork construction is prone to landslides and landslide incidents.
Main preventive measures are:
Make the necessary before construction of the geological, hydrological, and the investigation of underground pipeline to develop the corresponding earth excavation program.
Exclude surface water, groundwater, to prevent water erosion, leaching flow generating landslide or collapse.
Excavation should be carried out on the next strictly prohibited dig hole digging construction.
Strictly in accordance with the soil and the depth of the situation Slope, Slope coefficient according to the construction
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160793次
- Autocad2013 64位32位破解版附带注册机
- 148387次
- 天正建筑8.5破解版
- 144091次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123426次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73859次
- cad图集大全
- 56942次
- 11g101图集全套下载
- 45673次
- 可溶性泥土中的管桩地基抗曲率不稳定的
- 392次
- 基坑支护安全检查评分表
- 380次
- 岩土工程安全监测手册
- 374次
- 基坑开挖中的安全监测及事故防治措施—
- 343次
- 04施工现场设施安全设计计算手册-地基
- 333次
- 防止基坑土方坍塌的安全技术措施
- 332次
- 基坑支护工程安全专项方案
- 306次
- 02施工现场设施安全设计计算手册-降水
- 302次
- 广州南沙开发区工程沉管灌注桩安全技术
- 297次
- 竖井开挖安全措施及堵井处理预案
- 296次