桩基础施工技术现状及发展趋向浅谈
1 桩基础施工技术现状
  按施工方法,桩可分为非挤土桩、部分挤土桩和挤土桩三大类。再细分,桩的施工方法超过300种。施工方法的变化、完善、更新可以说是日新月异。图1中列出桩的部分施工类型。
  以埋入式桩为例,图中仅列出三大类,实际上细分可有80种以上类型。所谓中掘施工法桩是把小于桩径30~40mm的长螺旋钻、或钻杆端部装有搅拌翼片的螺旋钻及钻斗钻等插入桩的中空部,在钻头附近的地层连续钻进,使土沿中空部上升,从桩顶排土的同时将桩沉设。在施工中通常将桩端注入压缩空气和水,促进钻进的同时也使桩沉顺利。为使桩获得更大的承载力,桩埋入孔中后可分别采用量终打击方式、桩端加固方式或扩大头加固方式。按中掘埋入工艺、钻机、承载力发挥方法及采用的预制桩种类等,中掘施工法桩又可细分为40余种桩型。而预钻孔埋入式桩亦可细分为40余种。
  以泥浆护壁法钻孔扩底灌注桩的成孔方法为例,亦有40种以上,扩底方式可分为反循环扩底、钻斗钻扩
Pile Foundation Construction Status and Development of
1 Foundation Construction Status
By construction method, the pile can be divided into non-displacement pile, pile some soil compaction and displacement pile three categories. Subdivided, pile construction method more than 300. Changes in construction methods, improve, update can be said with each passing day. Figure 1 lists some of the construction of pile type.
With embedded pile, for example, the figure only three categories are listed, in fact, can be broken down more than 80 types. The so-called dig construction method in the pile is the pile diameter to less than 30 ~ 40mm long spiral drill, or drill pipe equipped with a stirring wing tip of the auger drill and drill bucket drilling hollow pile into the Department, in formation near the drill row drilling, the Department of the soil, up along the hollow, the top row of soil from the pile while the pile Shen set. During construction, usually pile into the air and water, while also promoting drilling pile Shen smoothly. In order to obtain greater capacity of piles, pile buried in holes in the volume were used after the end of Strike, pile reinforcement or by way of expansion of the first reinforcement. Embedded in the process by digging, drilling, and the capacity to play a method used in other types of precast piles, pile in the excavation construction method can be subdivided into 40 types of piles. The pre-bored piles can be broken down into embedded more than 40.
Drilling Slurry Wall method to reamed piles hole method, for example, have more than 40, expanding the end of cycle can be divided into anti-footed, fighting drill extension drill
 