东莞市百安石化仓储有限公司立沙岛石化仓储项目综合办公楼桩基施工组织设计.r.doc
立沙岛石化仓储项目预应力管桩
桩基础工程施工组织设计
第一章 工程概况
第一节 工程简介
东莞市百安石化仓储有限公司兴建的立沙岛石化仓储项目综合办公楼位于东莞市沙田镇立沙岛,根据广东省石油化工设计院设计图纸2005年12月版。本工程基础采用锤击预应力混凝土管桩基础,具体工程量如下表:
栋号 桩型 单桩承载力特征值
(KN) 预计桩长
(m) 桩数
(根)
综合办公楼 PHCΦ400×95(A) 1000 22 76
合计 PHCΦ400×95(A) 76
第二节 设计图中的要求
Li Milton Petrochemical Storage Project prestressed concrete pipe
Pile Foundation Construction organization design
Chapter Project Overview
Section I Project Description
Dongguan Petrochemical Storage Co., Ltd. 100 On the construction of petrochemical storage projects stand Milton office building is located in Dongguan City, Sha Tian Zhenli sand island, according to Guangdong Petrochemical Design Institute Drawings in December 2005 edition. The basis of this project by hammering prestressed concrete foundation and concrete works are shown below table:
Building No. pile bearing capacity characteristic value
(KN) is expected to pile length
(M) pile numbers
(Root)
Office building PHCΦ400 × 95 (A) 1000 22 76
Total PHCΦ400 × 95 (A) 76
Design requirements in Section
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160543次
- Autocad2013 64位32位破解版附带注册机
- 148312次
- 天正建筑8.5破解版
- 144047次
- autocad2012 64位32位 破解版(附注册
- 137474次
- 天正建筑8.2破解版
- 123394次
- autocad2010免费下载(简体中文版)
- 97140次
- CAD2008注册机及使用说明
- 80812次
- 免费农村房屋设计图
- 73732次
- cad图集大全
- 56766次
- 11g101图集全套下载
- 45320次
- 基坑土方开挖专项施工方案
- 1627次
- 土方开挖专项方案
- 1037次
- 基础回填土施工方案
- 658次
- 深基坑支护工程设计技术
- 525次
- 临港新城书院社区三期—2动迁商品住宅
- 498次
- 2004浙G23钻孔灌注桩
- 456次
- 外墙涂料工程分项工程质量技术交底卡
- 442次
- Dj6强夯法、强夯置换法处理地基
- 403次
- 预应力管桩施工地基土隆起的预控措施
- 401次
- 建筑施工手册(第四版)土方与基坑工程
- 400次