第一节  工程概况
一、工程简介
拟建的实验楼,位于C市J区,五层现浇钢筋砼框架结构,总建筑面积约9008平方米;采用D400管桩承台基础,无地下室,瓦屋面(坡屋面);
工期:暂定于2005年×月×日开工,于2005年×月×日竣工,总工期为147个日历天
现场条件:本工程的施工场地已平整,施工提供用水总管径为DN250mm,施工用电提供总负荷为200KW;施工范围内可通行施工车辆及供施工设备和材料小量分批堆放。
工程施工范围:包括红线范围内的土建工程、水电安装工程、装修工程施工。具体专业内容包括建筑、结构、给排水系统、电气工程(包括防雷工程)、消防和喷淋系统、空调系统、装修工程、人防工程等。
质量标准:达到《工程施工质量验收规范》合格标准,争创优良工程。工程竣工验收达不到合同约定的质量标准的,我公司向发包人交纳审定结算总价2%的违约金。
保修期限:按中华人民共和国国务院令第279号《建设工程质量管理条例》和建设部2000年第80号令的规定执行。保修期自竣工验收签字之日起计。
竣工资料:确定工程竣工时间前14天内,我公司向招标人(由监理单位先行审查合格)提交符合建档管理规定要求的竣工资料一式肆份。
二、建筑工程
Section Project Profiles
I. Brief Introduction of
The proposed laboratory building, located at C City, J District, five-situ reinforced concrete frame structure with a total construction area of about 9008 square meters; with D400 pile cap foundation, no basement, tile roof (sloping roof);
Duration: tentatively scheduled for 2005 × month × day started at 2005 × month × date completed, the total duration of 147 calendar days
Field conditions: the project's construction site has been formed, the total diameter of the construction to provide water DN250mm, construction of electricity to provide the total load of 200KW; construction within the scope of access for construction vehicles and construction equipment and materials piling up small batches.
Construction area: including the red line within the scope of civil engineering, water and electricity installation, renovation construction. Specific expertise includes architecture, structure, drainage systems, electrical works (including mine works), fire and sprinkler systems, air-conditioning system, renovation, civil air defense projects.
Quality Standard: meet, "Construction Quality Acceptance of" eligibility criteria, striving to good works. Projects reach completion and acceptance of quality standards agreed in the contract, the company paid to the developer is audited balance sheet total of 2% penalty.
Warranty period: According to The People's Republic of China State Council Order No. 279, "Construction Quality Control Regulations" and the Ministry of Construction Decree 80 of 2000 shall apply. Warranty period from signing the final acceptance date.
Completion data: identification work is completed within 14 days prior to the time, my company to the tenderer (first pass the examination by the supervisory agencies) to the regulations meet the filing requirements of the completion data of a type wantonly copies.
Second, construction
 