一、工程概况
陕西府谷电厂一期2×600MW工程厂址位于陕西省府谷县境内,北距庙沟门镇3公里,东距县城约40公里,庙沟门镇~府谷县城公路由北向南穿过厂区,交通较为便利。灰库位于1#锅炉南侧,1#、2#粗灰库及3#细灰库呈南北方向排列。
根据场地岩土工程条件,灰库区域回填土较厚,且灰库上部建筑物荷载较大,天然地基不能满足使用要求,需要进行地基处理。本工程地基处理拟采用混凝土灌注桩,混凝土灌注桩共计87根,桩径800㎜,桩长约18m左右,打入⑩岩层不小于3.0m。工程桩主筋采用14Ф16,加强箍筋Ф18@1500沿全长布置,螺旋箍筋桩身上部3m为Ф10@100,中部7m范围内为Ф10@200,桩身下部为Ф10@300。按照设计要求钢筋笼高出承台底部600㎜。
本工程设计工程量如表1:
First, project survey
Fugu, Shaanxi, a 2 × 600MW power plant project is located in Fugu County, Shaanxi Province, 3 km south of miaogoumen town, about 40 kilometers east county, miaogoumen Town ~ Fugu County from north to south through road factory, traffic is convenient. Ash is located in a boiler at the south side, 1 #, 2 # 3 # Crude Ash and Fine Ash was arranged north-south orientation.
According to the conditions of Site, Ash Backfill thick region, and the upper part of the building load Ash greater use of natural foundation can not meet the requirements, the need for ground treatment. The project will adopt concrete pile foundation treatment, a total of 87 concrete piles, pile diameter of 800 mm, about 18m long pile, into the ⑩ rock is not less than 3.0m. Pile reinforcement, using 14Ф16, strengthen stirrup Ф18 @ 1500 along the full layout of spiral reinforcement for the pile top 3m Ф10 @ 100, within the scope of the central 7m Ф10 @ 200, the lower part of pile Ф10 @ 300. Reinforcement cage in accordance with the design requirements of 600 mm above the bottom cap.
The amount of engineering design projects, such as Table 1: