一、工程概况
张杨滨江花苑项目基地面积为48600平方米,由A,B,C,D,E五幢高层、一栋三层会所及地下车库组成。高层主体建筑最高为127.6米,最低97.3米。主楼均设两层地下室,层高为3.8米和2.65米。
本工程±0.00相对于绝对标高6.700米,基坑开挖区域呈梯形,总长为259.1米,最宽处168.4米,最窄处41米,其面积约为33416平方米。主楼基础由箱形基础和桩基组成,地下车库由抗拔桩基和大型底板组成。主楼基础最深的底板厚度为2.2米,底标高为-8.55米,落深处标高12.7米,地下车库基础底板厚度为600毫米,底标高为-7.10米。现场自然地坪面层标高-1.5米,则主楼最深的基础实际开挖深度为7.30米,局部落深的基础实际开挖深度为11.45米;地下车库实际开挖深度为5.9米。基坑围护采用重力坝形式挡土隔水,其内部没有水平支撑,整个基坑开挖总方量约230000立方米。
二、周围环境和地质情况
项目位于浦东金融贸易区,西侧临近黄浦江边,其中主楼围护边距离江边最近的仅有38米。根据勘察提供的地质资料及对土工试验、工程剖面图分析,(3)-夹层灰色粘质粉土颗粒组成中粘粒含量一般均小于13%,孔隙比大于1,含水量大于30%,并夹有小量薄层粉砂,该层在地下渗流的
Zhang deep excavation Garden Riverside
First, project survey
Zhang Riverside Garden project base area of 48,600 square meters, from the A, B, C, D, E 5 senior, a three-tier composition of clubs and underground garage. Top of the main building up to 127.6 meters, the minimum 97.3 meters. The main building located two basement floors of 3.8 meters and 2.65 meters.
The project ± 0.00 relative to the absolute elevation of 6.700 meters, was trapezoidal excavation area, a total length of 259.1 m, maximum width of 168.4 meters, 41 meters narrowest, its area is about 33,416 square meters. Main Building foundation and pile foundation by the box formed by the uplift pile underground garage and large bottom composition. Based on the thickness of the deepest floor main building is 2.2 meters, the bottom elevation of -8.55 m, 12.7 m off the deep level underground garage of the base thickness of 600 mm, the bottom elevation of -7.10 m. On-site natural floor surface elevation -1.5 m, the main building based on the actual excavation of the deepest depth of 7.30 m, Bureau of tribal basis of the actual excavation of deep depth of 11.45 m; underground garage the actual excavation depth of 5.9 meters. Foundation Pit by retaining the form of resisting gravity, not the level of its internal support, the total square excavation about 230 thousand cubic meters.
Second, the environment and geology
Project Finance and Trade Zone in Pudong, near the west side of the Huangpu River, which from the river side of the main building envelope of only 38 meters recently. According to geological surveys to provide information and on the soil test, engineering profile analysis, (3) - Laminated gray clayey silt particles in the composition of clay content are generally less than 13% void ratio greater than 1, the water content greater than 30 %, and there are the small thin silt, the layer of underground seepage
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160543次
- Autocad2013 64位32位破解版附带注册机
- 148312次
- 天正建筑8.5破解版
- 144047次
- autocad2012 64位32位 破解版(附注册
- 137474次
- 天正建筑8.2破解版
- 123394次
- autocad2010免费下载(简体中文版)
- 97140次
- CAD2008注册机及使用说明
- 80812次
- 免费农村房屋设计图
- 73732次
- cad图集大全
- 56766次
- 11g101图集全套下载
- 45320次
- 基坑土方开挖专项施工方案
- 1627次
- 土方开挖专项方案
- 1037次
- 基础回填土施工方案
- 658次
- 深基坑支护工程设计技术
- 525次
- 临港新城书院社区三期—2动迁商品住宅
- 498次
- 2004浙G23钻孔灌注桩
- 456次
- 外墙涂料工程分项工程质量技术交底卡
- 442次
- Dj6强夯法、强夯置换法处理地基
- 403次
- 预应力管桩施工地基土隆起的预控措施
- 401次
- 建筑施工手册(第四版)土方与基坑工程
- 400次