大连港矿石专用码头陆域开山回填工程投标文件(技术标).doc
标件Ⅴ 施工组织设计
一、工程概况
1、工程名称及建设地点
本标工程系大连港矿石专用码头陆域开山回填工程,建址于大连市金州区大孤山半岛的东南岸,距大窑湾港区约4km。
2、工程范围及内容
(1)baopo开挖工程
矿石码头堆场周边山体baopo开挖,开采用于场区回填的渣石及石英岩或灰绿岩大块石等特殊要求石料。开挖的山坡面形成1:0.75永久性或半永久性边坡(不包括护坡及排水沟)。
(2)陆域回填工程
堆场高程▽40.0m以下、辅建区▽34.0m以下、铁路装车线▽17.35m以下及临时施工场地▽7.0m以下范围的回填。不含基础强夯处理工程。
(3)土石方外运
Construction design standard parts Ⅴ
First, project survey
1, Project Name and Location
The standard engineering Dalian Ore Terminal Land mountains reclamation of construction sites in the Jinzhou District of Dalian City, Dagushan Peninsula's southeast coast, from Port Dayaowan about 4km.
2, scope and content
(1) Blasting Excavation
Ore Yard blasting around the mountain, mining backfill for the site area or gray green slag stone and quartzite rock boulder stone and other special requirements. Excavation of the hillside for forming a permanent or semi-permanent slope 1:0.75 (not including the slope and drainage ditches).
(2) Land reclamation of
▽ 40.0m yard elevation below the auxiliary building area ▽ 34.0m below the railway line ▽ 17.35m Following loading and temporary construction site ▽ 7.0m the following range of backfill. Without basic dynamic compaction project.
(3) earth Sinotrans