夯扩挤密水泥砂石桩施工组织设计.doc
目 录
一、工程概况 2
二、场地工程地质水文地质条件 2
三、编制依据 3
四、钻孔夯扩挤密桩复合地基设计方案 4
五 施工组织机构 5
六 施工人员计划及施工工期 6
七 施工设备计划 6
八 施工材料﹑水﹑电计划 6
九、钻孔夯扩挤密碎石桩施工过程简介 6
十、夯扩挤密桩质量控制措施 7
十一、检验及试验 9
十二、施工安全、消防与文明施工管理 9
CONTENTS
1, Engineering Overview 2
Second, site engineering geologic and hydrological and geological conditions of 2
Third, the preparation according to 3
4, drilling Compacted pile composite foundation design 4
5 5 Construction Organization
Six construction workers planning and construction period 6
7 plan 6, construction equipment
Eight construction materials, water, electricity plan 6
9, drilling Compacted gravel pile construction Introduction 6
10, Compacted 7 pile quality control measures
11, inspection and testing 9
12, construction safety, fire and civil construction management 9