地下室基坑支护工程.doc
一、工程概况:
拟建的XX_大厦位于XX_。拟建场地原为XX_,场地地势南高北低,场地东南方向有XX_,拟建物主楼XX_层,两侧辟楼XX_层,地下室XX_层,面积约XX_平方米。
场地周围环境概况 第 1 页 共 1 页
二、场地周围环境概况
拟建物东南侧及西侧均有已建房屋,且距离较近,拟建物轴线距东南侧已建的XX_住宅楼间距仅XX_米,该已建六层楼北轴线基础为柱下条形基础,基础外挑XX_米,基础埋深约XX_米。
扬地西侧为XX_住宅楼,拟建物轴线距离有建筑外墙8米,已有建筑物基础情况不明。
1, Project Overview:
The proposed XX_ building located XX_. The proposed site was originally XX_, high and low-lying site, the venue southeast direction XX_, the proposed main building XX_ layer materials, provision of floor XX_ layer on both sides of the basement XX_ floor area of about XX_ square meters.
Venues around the environmental profile Page 1 of 1 page
Second, the venue environment overview
The proposed materials have been the southeast and the west side of building houses, and the close proximity of the axis from the southeast of the proposed property has been built XX_ residential floor space is only XX_ meters, the six floors has been built based on the column under the North axis Article form the basis fundamentals pick XX_ meters, based on depth of about XX_ meters.
Yang to the west side of the XX_ residential building, the proposed exterior wall material axis distance of 8 meters, the basis of existing buildings is unknown.