地下室基坑支护工程.doc
一、工程概况:
拟建的XX_大厦位于XX_。拟建场地原为XX_,场地地势南高北低,场地东南方向有XX_,拟建物主楼XX_层,两侧辟楼XX_层,地下室XX_层,面积约XX_平方米。
场地周围环境概况 第 1 页 共 1 页
二、场地周围环境概况
拟建物东南侧及西侧均有已建房屋,且距离较近,拟建物轴线距东南侧已建的XX_住宅楼间距仅XX_米,该已建六层楼北轴线基础为柱下条形基础,基础外挑XX_米,基础埋深约XX_米。
扬地西侧为XX_住宅楼,拟建物轴线距离有建筑外墙8米,已有建筑物基础情况不明。
1, Project Overview:
The proposed XX_ building located XX_. The proposed site was originally XX_, high and low-lying site, the venue southeast direction XX_, the proposed main building XX_ layer materials, provision of floor XX_ layer on both sides of the basement XX_ floor area of about XX_ square meters.
Venues around the environmental profile Page 1 of 1 page
Second, the venue environment overview
The proposed materials have been the southeast and the west side of building houses, and the close proximity of the axis from the southeast of the proposed property has been built XX_ residential floor space is only XX_ meters, the six floors has been built based on the column under the North axis Article form the basis fundamentals pick XX_ meters, based on depth of about XX_ meters.
Yang to the west side of the XX_ residential building, the proposed exterior wall material axis distance of 8 meters, the basis of existing buildings is unknown.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160543次
- Autocad2013 64位32位破解版附带注册机
- 148312次
- 天正建筑8.5破解版
- 144047次
- autocad2012 64位32位 破解版(附注册
- 137474次
- 天正建筑8.2破解版
- 123394次
- autocad2010免费下载(简体中文版)
- 97140次
- CAD2008注册机及使用说明
- 80812次
- 免费农村房屋设计图
- 73732次
- cad图集大全
- 56766次
- 11g101图集全套下载
- 45320次
- 基坑土方开挖专项施工方案
- 1627次
- 土方开挖专项方案
- 1037次
- 基础回填土施工方案
- 658次
- 深基坑支护工程设计技术
- 525次
- 临港新城书院社区三期—2动迁商品住宅
- 498次
- 2004浙G23钻孔灌注桩
- 456次
- 外墙涂料工程分项工程质量技术交底卡
- 442次
- Dj6强夯法、强夯置换法处理地基
- 403次
- 预应力管桩施工地基土隆起的预控措施
- 401次
- 建筑施工手册(第四版)土方与基坑工程
- 400次