碧云阁外脚手架工程承包合同.doc
碧云阁外排栅工程承包合同
甲方:(为发包人全称):
乙方:(为承包人全称):
为了更好地把碧云阁A、B、C、D座外排栅工程的质量、安全、进度,按照有关建筑规范顺利完成,经甲乙双方共同协商,履行各自的承诺,特签定如下合同条款,需双方共同遵守:
一、工程概况
碧云阁工程位于花都区新华镇天贵路以东,曙光路以西,紫薇大道以南,迎宾路以
北,共分A、B、C、D四座,其中A、B两座设计楼高18层,C、D两座设计楼高13层,集车库、商业、住宅、会所一体化管理,结构形式为框剪结构。
三、承包范围
1、 A、B、C、D座室外扣件式双排钢管脚手架工程的安装和拆除全部施工过程。
2、A、B、C、D座外脚手架要求全钢双排,平桥内铺钢筛网、楼层挡脚板。
3、包A、B、C、D座施工人员上下楼梯、安全挡板、电梯井脚手架、斜料平台。
4、包安全帽、安全网(含兜底安全网)、安全带,并提供有效的出厂合格证书及检测报
告原件,所有检测费用由乙方承担。乙方所提供的安全网必须是经花都安全监督部门检测合
格的鱼丝网。
5、包A、B、C、D座楼梯口、电梯口、所有安全通道口、所有楼层的预留洞口防护搭
设。
6、包基坑边、各楼层阳台、楼板及屋面等临边防护、所有楼层洞口临边防护搭设。
四、承包形式
包材料、包工期、包质量、包安全、包人工费、包场地内外脚
Pik House efflux gate engineering contract
Party A: (for the developer is in full):
B: (for the contractor in full):
In order to better the Pik House A, B, C, D Block, the efflux gate project quality, safety, progress, according to the successful completion of the building codes, joint consultation by both parties to fulfill their commitments, particularly following the contract signing terms, requires that both sides abide by:
First, project survey
Pik Xinhua Zhen, Huadu District Court project is located at the east of Tin Kwai Road, Shuguang Road, west of Myrtle Avenue to the south of Welcome Road to
North, divided into A, B, C, D 4, where A, B two-storey 18-storey design, C, D two 13-storey design, set the garage, commercial, residential, club integrated management structure for the superstructure.
Third, the scope of contract
1, A, B, C, D Block, outdoor double steel fastener installation and removal of falsework all of the construction process.
2, A, B, C, D Block double steel scaffolding requirements, Pingqiao steel mesh inside the shop, floor block feet.
3, including A, B, C, D Block, construction workers up and down stairs, security shield, elevator shaft scaffold, ramp materials platform.
4, including safety helmets, safety nets (including fallback safety net), seat belts, and to provide effective detection of the factory certificate and report
Report original costs of all testing by the second party. The safety net provided by Party B to be detected by the Huadu safety supervision departments together
Fish screen grid.
5, including A, B, C, D Block, stairs, elevator, secure access to all ports, all the floors take the reserved hole protection
Set.
6, including pit side, each floor balcony, floor and roof of the temporary edge protection, protection of all floor hole limb erection.
Fourth, contract forms
Package materials, including schedules, including quality, including safety, including labor costs, including venues inside and outside the foot
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160948次
- Autocad2013 64位32位破解版附带注册机
- 148475次
- 天正建筑8.5破解版
- 144124次
- autocad2012 64位32位 破解版(附注册
- 137488次
- 天正建筑8.2破解版
- 123473次
- autocad2010免费下载(简体中文版)
- 97171次
- CAD2008注册机及使用说明
- 80874次
- 免费农村房屋设计图
- 73964次
- cad图集大全
- 57065次
- 11g101图集全套下载
- 45920次
- 《建设工程施工合同》GF-1999-0201
- 4085次
- 建筑工程施工承包协议书
- 1274次
- j脚手架搭设承包合同(修10)
- 766次
- 合同范本--利润分配
- 762次
- k水电安装工程劳务承包合同(嘉11)
- 695次
- 碧云阁外脚手架工程承包合同
- 597次
- g屋面防水工程劳务承包合同(嘉7)
- 582次
- 电气工程承包合同
- 558次
- 《建筑装饰工程施工合同》[乙种本]
- 540次
- c钢筋制作及绑扎劳务承包合同(嘉3)
- 516次