您现在的位置:主页 > 工程造价 > 施工合同 > >>

滨江大道隧道安装工程施工合同.doc

资料评价:
★★★☆☆
更新时间:
2010-07-20
下载要求:
注册会员
文档大小:
0.02 MB
授权方式:
共享资料
上传会员:
龙龙
文档类型:
.doc
所属栏目:
施工合同
需要金币:
1
资料语言:
简体中文
资料简介:免费注册 本站会员可得金币,更多赚积分方法请查看:积分说明 下载地址

电气安装工程施工协议
甲方:中隧股份南京滨江大道隧道工程项目经理部
乙方:
按照《中华人民共和国合同法》和《建筑安装工程承包合同条例》的规定,结合本工程的具体情况,中隧股份南京滨江大道隧道工程项目经理部与     就滨江大道隧道机电设备安装工程的施工事宜达成如下协议。
1.工程概况:
1.1工程名称:南京滨江大道隧道机电设备安装工程
1.2工程地点:南京市河西区棉花堤(原7路车站)
1. 3工程范围:(隧道内及泵房)
1.3.1给排水系统安装工程;
1.3.2消防系统安装工程;
1.3.3泵房工艺设备系统安装工程;
1.3.4电力照明系统安装工程;
1.3.5通风系统安装工程;
1.4工程内容:
1.4.1给排水系统安装工程:防撞墙内进水格栅安装,管道清洗;
1.4.2消防系统安装工程:消防管道、栓、箱安装,冲洗、试压及系统调试;
1.4.3泵房工艺设备系统安装工程:潜水泵、格栅除污机、电动葫芦、泵房工艺管道制安等其它机械设备、货物进场运输、安装及系统调试;
1.4.4电力照明系统安装工程:管线布置及电线电缆敷设、桥架安装、照明灯具、高低压配电柜、箱、自动化仪表控制及配套设备安装,调试等;
1.4.5通风系统安装工程:通风管、阀、风口制安,通风机
Electrical Installation Construction Agreement
Party: The shares of Nanjing Riverside Avenue Tunnel Tunnel Project Manager Department
B:
In accordance with the "Contract Law" and the "construction and installation contract regulations" requirement, combined with the specific circumstances of this project, the stake of Nanjing Riverside Avenue Tunnel Tunnel Project Manager Department of Mechanical and Electrical Equipment on Riverside Avenue, the installation of tunnel construction issues reached the following agreement.
1. Project Overview:
1.1 Project Name: Nanjing Riverside Avenue tunnel installation of electromechanical equipment
1.2 Project Location: Nanjing Hexi District, cotton dike (the original 7 Road Station)
1.3 Scope: (tunnels and pumping stations)
1.3.1 installation of water supply and drainage system;
1.3.2 fire system installation;
1.3.3 Pumping Station Equipment System Installation;
1.3.4 installation of electric lighting systems;
1.3.5 installation of ventilation systems;
1.4 Project Content:
1.4.1 for the installation of drainage system: water grid crash wall installation, pipe cleaning;
1.4.2 installation of fire fighting system: fire pipe, bolt, box installation, flushing, pressure testing and system debugging;
Pumping Station Equipment System 1.4.3 installation: submersible pump, grate discharge machine, electric hoist, pump and other process piping system, machinery safety equipment, goods entering the transport, installation and system commissioning;
1.4.4 installation of electric lighting systems: pipeline layout and cable laying, bridge installation, lighting, high and low voltage power distribution cabinets, boxes, automated instrument control and auxiliary equipment installation and commissioning;
1.4.5 installation of ventilation systems: ventilation pipe, valves, outlet system security, fan

帮助 收藏 报错 评论>>
滨江大道隧道安装工程施工合同下载
点击此处下载