建设工程施工合同(电力2).doc
建设工程施工合同
(电力2)
电力建设工程施工合同条件
第一章 词语涵义及合同文件
第一条 词语涵义
《电力建设工程施工合同》文本,由《电力建设工程施工合同条件》(以下简称《合同条件》和《电力建设工程施工合同协议条款》(以下简称《协议条款》)组成,其用词用语除《协议条款》另有约定外,应具有本条所赋予的涵义:
1.发包方(简称甲方);《协议条款》约定的具有工程发包主体资格和支付工程价款能力的当事人。
2.甲方驻工地代表(简称甲方代表:甲方在《协议条款》中指定的代表人。
3.承包方(简称乙方):《协议条款》约定的、具有《电力施工企业资质管理办法》规定的工程承包主体资格并被发包方接受的当事人。
4.乙方驻工地代表(简称乙方代表):乙方在《协议条款》中指定的代表人。
5.社会监理:受甲方委托、具备《电力工程建设监理单位资质管理办法》规定资格的工程监理单位或人员对工程进行的监理。
6.总监理工程师:工程监理单位委派的监理总负责人。
7.设计单位:甲方委托的具备《电力工程勘察设计单位资质管理办法》规定的相应资质等级的设计单位。
8.工程造价管理部门:国务院各有关部门、各级建设行政主管部门或如上部门授权的建设工程造价管理机构。
9.工程质量监督部门:电力工业部、电业管理局、省(直辖市、自
Construction Contract
(Power 2)
Electric Power Construction Contract Conditions
Chapter Meaning of words and the contract documents
The first meaning of the words
"Power Construction Contract," the text, from "Power Construction Contract Conditions" (hereinafter referred to as "Contract Conditions" and "Power Construction Contract Articles of Agreement" (hereinafter referred to as "terms"), and its terms except terms "terms of the agreement," otherwise agreed, shall have the meaning ascribed to this article:
1. Party giving (Party); "the terms" agreement with engineering contracting works price of the main qualifications and ability to pay the party.
2. Party representatives in the site (referred to as Party A on behalf of: Party in the "terms" in the designated representative.
3. Contracting Party (B): "the terms" agreement, with the "Administrative Measures Power Construction Qualification" requirements engineering contracting party awarding the qualification and is accepted by the parties.
4. Party representatives in the site (referred to as Party B on behalf of): B in the "terms" in the designated representative.
5. Community supervision: commissioned by the Party, with "power engineering construction supervision, the qualification management approach" provides qualified engineering supervision unit or personnel to conduct the supervision of the project.
6. Chief supervision engineer: engineering supervision unit assigned overall responsibility for supervision.
7. Designer: Party entrusted with "power engineering survey and design management approach, the qualification" provided the appropriate qualification level design unit.
8. Project Cost Management: The State Council departments, administrative departments at all levels of construction or the above agencies authorized construction project cost management organizations.
9. Engineering quality supervision departments: Ministry of Power Industry, Electricity Authority, the province (municipality, since the
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160948次
- Autocad2013 64位32位破解版附带注册机
- 148475次
- 天正建筑8.5破解版
- 144124次
- autocad2012 64位32位 破解版(附注册
- 137488次
- 天正建筑8.2破解版
- 123473次
- autocad2010免费下载(简体中文版)
- 97171次
- CAD2008注册机及使用说明
- 80874次
- 免费农村房屋设计图
- 73964次
- cad图集大全
- 57065次
- 11g101图集全套下载
- 45920次
- 《建设工程施工合同》GF-1999-0201
- 4085次
- 建筑工程施工承包协议书
- 1274次
- j脚手架搭设承包合同(修10)
- 766次
- 合同范本--利润分配
- 762次
- k水电安装工程劳务承包合同(嘉11)
- 695次
- 碧云阁外脚手架工程承包合同
- 597次
- g屋面防水工程劳务承包合同(嘉7)
- 582次
- 电气工程承包合同
- 558次
- 《建筑装饰工程施工合同》[乙种本]
- 540次
- c钢筋制作及绑扎劳务承包合同(嘉3)
- 516次