建设工程施工合同条件.doc
建设工程施工合同条件
第一章 词语涵义及合同文件
第一条 词语涵义。建设工程施工合同文本,由建设工程施工合同条件(以下简称合同条件)和建设工程施工合同协议条款(以下简称协议条款)组成。其用词用语除协议条款另有约定外,应具有本条款所赋予的涵义:
1.发包方(简称甲方):协议条款约定的、具有发包主体资格和支付工程价款能力的当事人。
2.甲方驻工地代表(简称甲方代表):甲方在协议条款中指定的代表人。
3.承包方(简称乙方):协议条款约定的、具有承包主体资格并被发包方接受的当事人。
4.乙方驻工地代表(简称乙方代表):乙方在协议条款中指定的代表人。
5.社会监理:甲方委托具备法定资格的工程监理单位或人员对工程进行的监理。
6.总监理工程师:工程监理单位委派的监理总负责人。
7.设计单位:甲方委托的具备相应资质等级的设计单位。
8.工程造价管理部门:国务院各有关部门、各级建设行政主管部门或其授权的工程造价管理部门。
9.工程质量监督部门:国务院各有关部门、各级建设行政主管部门或其授权的工程质量监督机构。
10.工程:协议条款约定具体内容的永久工程。
12.合同价款:按有关规定或协议条款约定的各种收费标准计算的,用以
Construction Contract Conditions
Chapter Meaning of words and the contract documents
The first words meaning. Building construction contracts, building construction by the terms of the contract (hereinafter referred to as contract terms), and the terms of Construction Contract (hereinafter referred to as terms of the agreement) form. In addition to the terms of its wording terms otherwise agreed, shall have the meaning ascribed to this article:
1. Contractee (Party): the terms of agreement, with the bidding price for the qualification and ability to pay the parties works.
2. Party on-site representatives (Party representative): Party in the terms specified in the proxy.
3. Contracting Party (B): the terms of agreement, the qualification was party contracting with contractors acceptable to the parties.
4. B on-site representatives (referred to as Party B on behalf of): B in terms of the agreement specified representative.
5. Community supervision: Party entrusted with the legal status of project supervision units or personnel for the supervision of the project.
6. The chief supervision engineer: engineering supervision unit assigned overall responsibility for supervision.
7. Designer: Party entrusted with the appropriate qualification level design unit.
8. Project Cost Management: The State Council departments, administrative departments at all levels of construction or the authorized project cost management.
9. Engineering quality supervision departments: the State Council departments, or administrative departments at all levels of construction projects authorized by the quality of oversight bodies.
10. Project: the terms of the specific content of the permanent works contract.
12. Contract price: According to relevant provisions of the agreement or the terms of the various charges calculated for
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160948次
- Autocad2013 64位32位破解版附带注册机
- 148475次
- 天正建筑8.5破解版
- 144124次
- autocad2012 64位32位 破解版(附注册
- 137488次
- 天正建筑8.2破解版
- 123473次
- autocad2010免费下载(简体中文版)
- 97171次
- CAD2008注册机及使用说明
- 80874次
- 免费农村房屋设计图
- 73964次
- cad图集大全
- 57065次
- 11g101图集全套下载
- 45920次
- 《建设工程施工合同》GF-1999-0201
- 4085次
- 建筑工程施工承包协议书
- 1274次
- j脚手架搭设承包合同(修10)
- 766次
- 合同范本--利润分配
- 762次
- k水电安装工程劳务承包合同(嘉11)
- 695次
- 碧云阁外脚手架工程承包合同
- 597次
- g屋面防水工程劳务承包合同(嘉7)
- 582次
- 电气工程承包合同
- 558次
- 《建筑装饰工程施工合同》[乙种本]
- 540次
- c钢筋制作及绑扎劳务承包合同(嘉3)
- 516次