建设工程勘察合同.doc
第一部分 协 议 书
发包人:_________________________________________
勘察人:_________________________________________
发包人委托勘察人承担__________________________任务。
根据《中华人民共和国合同法》及国家有关法规规定,结合本工程的具体情况,为明确责任,协作配合,确保工程勘察质量,经发包人、勘察人协商一致,签订本合同,共同遵守。
第一条 工程概况
工程名称:___________________________________________________________________________
工程建设地点:_______________________________________________________________________
工程规模、特征:_____________________________________________________________________
工程勘察任务委托文号、日期:__________________________________________________________
工程勘察任务(内容)与技术要求:_______________________________________________________
承接方式:___________________________________________________________________________
预计勘察工作量:____________________________________________________________________
工程内容:__________________________________________________________________________
第二条 发包人应及时向勘察人提供下列文件资料,并对其准确性、可靠性负责。
2.1提供本工程批准文件(复印件),以及用地(附红线范围)、施工、勘察许可等批件(复印件)。
2.2提供工程勘察任务委托书、技术要求和工作范围的地形图、建筑总平面布置图。
2.3提供勘察工作范围已有的技术资料及工程所需的坐标与标高资料。
2.4提供勘察工作范围地下已有埋藏物的资料(如电力、电讯电缆、各种管道、人防设施、洞室等)及具体位置分布图。
2.5发包人不能提供上述资料,由勘察人收集的,发包人需向勘察人支付相应费用。
第三条 勘察人向发包人提交勘察成果资料并对其质量负责。
勘察人负责向发包人提交勘察成果资料四份,发包人要求增加的份数另行收费。
第四条 开工及提交勘察成果资料的时间和收费标准及
The first part of the written agreement
Letting people :_________________________________________
Survey were :_________________________________________
The developer is the person who commissioned the survey __________________________ task.
According to "The People's Republic of China Contract Law" and the relevant state regulations, combined with the project specific conditions as a clear responsibility, coordination and cooperation, ensure survey quality, Jing letting party, survey, in consultation 一致, sign this contract, mutual respect.
The first project overview
Project Name :___________________________________________________________________________
Project Location :_______________________________________________________________________
Project size, feature :_____________________________________________________________________
Engineering Investigation task principal symbol, date :__________________________________________________________
Engineering Investigation task (content) and technical requirements :_______________________________________________________
Transition Methods :___________________________________________________________________________
Investigation is expected workload :____________________________________________________________________
Engineering content :__________________________________________________________________________
The second bidding should promptly provide the following documents to the survey data and its accuracy, reliability, responsibility.
2.1 provide the project approval document (copy), and the land (with the red line area), construction, licensing, inspection approval document (copy).
2.2 the provision of engineering survey for instructions, technical requirements and scope of the map, the total building floor plan.
2.3 The scope of survey work has been to provide technical information and engineering data required for the coordinates and elevation.
2.4 The scope of survey work to provide information on objects buried underground have (such as electricity, telecommunications cables, all kinds of pipes, air defense facilities, chambers, etc.) and specific location of distribution.
2.5-letting can not provide the above information, collected by a survey of people, the developer is required to pay the appropriate inspection fee.
Article submitted by the surveyor or survey results to the bidding information and responsible for the quality of their.
Investigation is responsible for the outcome of the bidding data submitted by survey, four, letting people be charged for additional number of copies.
Article IV started and the information submitted by survey results and the time and fees