建筑工程施工承包协议书.doc
建筑工程施工承包协议书
合同编号:SZRRⅢ-A第02号
甲方:中铁十八局集团有限公司治理深圳河工程项目指挥部
乙方:宁夏伊斯兰地质工程公司天津分公司
为了治理深圳河三期二阶段合同A工程,现经甲乙双方协商,在平等、互惠互利的基础上,甲方将合同A中A工地、C工地范围内河道两侧堤防的地下连续墙及圈梁、水泥搅拌桩、网喷砼等项目承包给乙方施工。根据中华人民共和国《合同法》和《建筑工程承包合同条例》的原则,结合本工程具体情况,双方达成如下协议条款,供双方履行。
第一条 工程项目及主要工程量
1、工程名称:地下连续墙、地下连续墙圈梁、水泥搅拌桩、网喷砼等。
2、工程地点:治理深圳河三期二阶段合同A范围
3、主要工程数量:地下连续墙砼4510立方米;地下连续墙圈梁砼964立方米;水泥搅拌桩9429米;;网喷砼543平方米。
第二条 承包形式
1、承包形式:单价承包、包工包料、一次包死。
2、承包单价:详见“附表一 工料单”
3、说明:
工程量清单表中单价已包括为实施和完成并在工程竣工验收前的维修及在保修期的修复所必须的人工费、机械费、材料费、临时设施费、辅助工作费、管理费、风险及利润等全部费用(营业税除外)。
第三条 工期
1、乙方主要人员、设备必须在合同签订后 14 日内
Building Construction Contract Agreement
Contract Number: SZRR Ⅲ-A No. 02
Party A: China Railway 18 Bureau Group Co., Ltd. Shenzhen River Regulation Project Headquarters
B: Ningxia Islamic Geological Engineering Company Tianjin Branch
For the second phase of the Shenzhen River 3 A construction contract is currently in consultation by both parties, equality, mutual benefit, based on the contract Party A in the A site, C site within the river embankment on both sides of the underground continuous wall and the ring Liang, cement mixing, net spraying concrete construction projects contracted to the Party. According to The People's Republic of China, "Contract Law" and "construction contract regulations" with the principles of the specific circumstances of this project, the following terms of the agreement reached by both sides, for both sides to fulfill.
The first volume of projects and major projects
1, Project Name: underground continuous wall, diaphragm wall ring beam, cement mixing, spraying concrete and other networks.
2, Project Location: Shenzhen River 3 A range of two-stage contract
3, the number of major projects: 4510 cubic meters of concrete diaphragm wall; underground continuous wall ring beams and concrete 964 m3; cement mixing pile 9429 m;; net spraying concrete 543 square meters.
The second contract form
1, contract forms: unit price contract, contracting package material, a package die.
2, Contract Unit: See "Schedule a Quantity One"
3, Description:
Quantity Price List in the table includes the implementation and completion and maintenance works have been completed before the final acceptance and the warranty of the repair the Bixu of labor costs, machine costs, material costs, temporary facilities, fees, auxiliary Gongzuo fees, management fees, Fengxian and profits, and all other expenses (excluding sales tax).
Third period
1, B key personnel and equipment must be within 14 days after contract
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160948次
- Autocad2013 64位32位破解版附带注册机
- 148476次
- 天正建筑8.5破解版
- 144124次
- autocad2012 64位32位 破解版(附注册
- 137488次
- 天正建筑8.2破解版
- 123473次
- autocad2010免费下载(简体中文版)
- 97171次
- CAD2008注册机及使用说明
- 80874次
- 免费农村房屋设计图
- 73964次
- cad图集大全
- 57065次
- 11g101图集全套下载
- 45920次
- 《建设工程施工合同》GF-1999-0201
- 4085次
- 建筑工程施工承包协议书
- 1274次
- j脚手架搭设承包合同(修10)
- 766次
- 合同范本--利润分配
- 762次
- k水电安装工程劳务承包合同(嘉11)
- 695次
- 碧云阁外脚手架工程承包合同
- 597次
- g屋面防水工程劳务承包合同(嘉7)
- 582次
- 电气工程承包合同
- 558次
- 《建筑装饰工程施工合同》[乙种本]
- 540次
- c钢筋制作及绑扎劳务承包合同(嘉3)
- 516次