洁净车间自流平地坪施工工艺.doc
洁净车间自流平地坪施工
1、自流平洁净地坪的构造
随地坪在空间设置的位置不同,其构造也不尽相同。但其由上而下各构造层的做法基本相同。具体如下:
自流地坪涂料面层:达到洁净验收的要求。
水泥拌和物基层:具有足够的强度和平整度,能与面层很好粘结。
配筋混凝土结构层:承受地面荷载,保证地面有一定刚度。
防潮层:防止下部的水分、潮气渗透至地坪基层,以破坏面层和
Construction of self-leveling floor clean workshop
1, the construction of self-leveling floor clean
Ping anywhere to set the location in space different from its structure is different. But from the top layer of the structure is basically the same way. As follows:
Floor coating surface gravity: to clean inspection requirements.
Cement mixture Primary: have sufficient strength and smoothness, a good bond with the surface layer.
Layer of reinforced concrete structures: load bearing surface to ensure that the ground has a certain stiffness.
Moisture levels: prevention of lower water, penetrate to the floor damp grass roots, to destroy surface layer and
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 利用基础钢筋做接地极施工工艺流程框图
- 765次
- 卫生间地面细石混凝土找坡层(防水保护
- 735次
- 木饰面板及木作工程施工工艺
- 595次
- 玻璃采光顶工程施工工艺
- 527次
- 卫生间防水施工工艺
- 508次
- 屋面找平层施工工艺(1002-1996)
- 408次
- 轻钢龙骨石膏罩面板隔墙施工工艺标准(
- 406次
- JB4734附录B铝容器焊接工艺评定
- 403次
- 钻孔灌注桩施工标准工艺流程图
- 402次
- 004涂色镀锌钢板门窗安装工艺
- 402次