颗粒砂浆保温(外饰为涂料的)施工工艺.doc
颗粒砂浆保温(外饰为涂料的)施工工艺
一、作业条件:
1、基层墙体的质量必须符合相关质量验收规范和标准要求,主体结构已验收,并办理四方验收手续。
2、脚手架和外用电梯安装完毕并通过验收。
Particles mortar insulation (exterior to paint) construction technology
1, operating conditions:
1, the quality of primary wall must comply with the relevant norms and standards of quality acceptance, the main structure has been acceptance and acceptance procedures for handling the Quartet.
2, scaffolding and elevator installed by external inspection.