工程质量控制的程序和方法.doc
工程质量监理目标是:建立全面的质量控制体系,强化承包人自检体系的管理,严格做好中间的质量检验以及现场质量验收,搞好工序监测,强调以事前控制为主,严格开工报告的审批,预防质量通病的发生,杜绝施工质量事故,确保工程质量创优。
1.建立质量保证组织体系
1.1监理工程师必须建立完整的质量监控组织体系,以保证对所有施工环节进行有效控制。质量控制组织体系中应根据工程实际情况设置材料、试验、测量、计量等及各工程项目的专业技术岗位,并明确其名称和职责,实行工程质量终生岗位责任人制度。此外,应建立独立的监理中心试验室和测量机构,质量数据不与承包人共享。
1.2督促、检查承包人自检的三级质量保证体系。承包人自检质保体系的核心和基础是各级分项工程自检质量负责人和工地试验,监理工程师必须对其严格审查,不符合要求的必须及时更换和充实完善。
2.划分质量单元
为了保证对所有施工环节进行有效控制,必须将工程细分解并明确地划分出各质量单元。要做到工程划分各质量单元不遗漏,单元划分要与交通部“质量评定标准”分部分项工程划分一致,并画出各分部、分项工程、工程部
Project Quality Management objectives are: to establish a comprehensive quality control system, and strengthen the management of contractor self-inspection system, strict quality inspection, and the middle well site quality inspection, process monitoring well, the main emphasis of prior control, strict start report approval, to prevent the occurrence of quality defects, construction quality to prevent accidents, ensure the quality of excellence.
1. The establishment of quality assurance organization system
1.1 Management Engineer to establish a complete system of quality control organization to ensure effective control of all construction sectors. Organizational system of quality control should be under the engineering conditions, set materials, test, measurement, Ji Liang Deng and the engineering project Zhuanyejishu positions, and clearly identify its Ming Chen and responsibilities, the implementation of project quality life Gangweizeren Ren Zhi Du. In addition, the supervisor should establish an independent central laboratory and measurement organization, the quality of data is not shared with the contractor.
1.2 supervision, inspection, contractor self-test of the three quality assurance system. Contractor self-test quality assurance system is based on the core and sub-project at all levels responsible for the quality self-test and site testing, supervision engineers to be their critical review does not meet the requirements must be promptly replaced, and fleshed out.
2. The quality of cell division
In order to ensure effective control of all construction sectors, projects must be clearly defined and detailed decomposition and the quality of each unit. To do engineering division of the mass element is not omitted, unit with the Ministry of Communications "Quality assessment standards," sub-division of some of the same project, and draw the divisions, sub-projects, engineering
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160454次
- Autocad2013 64位32位破解版附带注册机
- 148292次
- 天正建筑8.5破解版
- 144039次
- autocad2012 64位32位 破解版(附注册
- 137473次
- 天正建筑8.2破解版
- 123375次
- autocad2010免费下载(简体中文版)
- 97140次
- CAD2008注册机及使用说明
- 80796次
- 免费农村房屋设计图
- 73687次
- cad图集大全
- 56715次
- 11g101图集全套下载
- 45183次
- 镀锌钢板的进场验收厚度允许偏差表
- 943次
- 建筑工程质量禁忌手册
- 861次
- 现浇钢筋混凝土结构楼板底模拆除的施工
- 474次
- 广东省住宅工程质量通病防治技术措施二
- 454次
- BT项目施工的质量控制
- 425次
- 建设工程施工质量验收的程序和组织
- 423次
- 建筑工程施工质量验收标准及通用表格
- 417次
- 设备安装的质量控制
- 402次
- 单位工程统表-2-2_单位(子单位)工程
- 401次
- 粉体喷射搅拌桩设计及施工质量控制
- 400次