荟芳园裙楼外立面改造工程外墙脚手架施工组织设计.doc
目 录
第一节 工程概况与编制依据 3
一、 工程概况 3
二、编制依据与参考书籍 3
第二节、施工准备工作及主要材料需用量计划 3
一、技术准备工作 3
二、物质准备工作 4
三、劳动力准备 4
第三节、一般规定 5
第四节 外墙脚手架搭设有关要求 6
一、搭设范围 6
二、有关要求 6
第五节 落地式双排钢管外脚手架搭设标准 7
一、脚手架材质 7
二、脚手架的基底 7
三、脚手架的扫地杆 8
四、架体与建筑物的拉结 9
五、脚手架板的铺设 12
六、立杆的纵距、横距、步距 13
七、外脚手架的防护 14
八、支撑体系 14
九、杆件搭设构造要求 18
十、荷载 19
十一、特殊部位处理 20
十二、搭设和拆除顺序 24
十三、搭设验收 、使用及管理 25
第六节 脚手架的结构 26
一、落地外脚手架 26
第七节、各项技术管理措施 27
一、脚手架材料质量控制措施 27
二、保证施工质量措施 27
三、保证施工安全措施 31
四、环境保护及文明施工措施 32
第八节、现场施工管理组织机构 33
一、安全生产管理目标 33
二、施工组织机构 34
2009-10/荟芳园裙楼外立面改造工程外墙脚手架施工组织设计.rar
CONTENTS
Survey and preparation of project based Section 3
First, project survey 3
Second, the preparation of the basis and reference books 3
Section II, the construction preparation work and the major amount of material required to plan 3
1, 3 technical preparations
Second, material preparation 4
Third, the labor to prepare 4
Section III, General Provisions 5
IV wall Scaffolding requirements 6
1, consists of placing the scope of 6
Second, the requirements 6
V floor double steel outer Scaffolding Standard 7
First, scaffolding material 7
Second, the scaffolding base 7
Third, scaffolding sweep shot 8
4, frame body and a building Rachel 9
5, scaffold boards laid on 12
6, pole of the vertical distance, horizontal distance, Step 13
7, 14, outside the protective scaffolding
8, support system 14
9, pole erection construction requirements of 18
10, load 19
11, a special area for 20
12, erection and dismantling of the order of 24
13, erection acceptance, use and management of 25
Section VI scaffolding structure 26
1, floor 26 outside the scaffold
Section VII, the technical management of 27
First, scaffolding materials, quality control measures 27
Second, ensure quality measures 27
Third, ensure safety measures 31 Construction
Fourth, environmental protection and construction measures 32 civilizations
Section VIII, on-site construction management organization 33
1, Safety management objectives of 33
Second, the construction of 34 organizations