国家体育馆施工组织设计.doc
第五章 施工部署 1
1.建立项目组织机构及责任制 1
1.1项目组织机构图 1
1.2建立岗位责任制 8
2.流水段划分 18
2.1施工流水段划分原则 18
2.2施工流水段划分 18
3.劳动力组织配备 20
3.1劳动力组织 20
3.2劳动力计划 20
4.主要施工顺序 21
4.1主要施工顺序图 22
5.施工部署原则及要点 23
5.1施工部署原则 23
5.2施工部署要点 23
6.协调管理与控制措施 24
6.1总承包单位的综合协调管理 24
6.2总承包与监理关系的协调 25
6.3总承包与设计关系的协调 26
6.4总承包与分包的协调管理 26
6.5总承包与各种材料供应单位的关系协调 27
6.6总承包与政府部门的关系协调 27
6.7总承包与周围居民的关系协调 27
Construction of the deployment of a Chapter
1. To establish the project organization and accountability 1
1.1 Project Organization Chart 1
1.2 The establishment of personal responsibility 8
2. Water segment is divided into 18
2.1 Construction of water dividing principle in paragraph 18
Division 18 Section 2.2 Construction of water
3. Labor organizations with 20
20 3.1 Labor Organization
3.2 Workforce Planning 20
4. The order of 21 major construction
4.1 The main construction sequence Figure 22
5. Construction of the principles and elements of the deployment of 23
5.1 Construction of the deployment of Principle 23
5.2 Construction of the deployment of 23 points
6. Coordination of management and control measures 24
6.1 The total integrated and coordinated management of 24 contractors
6.2 The relationship between general contractor coordination and supervision of 25
6.3 The relationship between general contractor and design of the coordination of 26
6.4 The general contractor and subcontractor coordination and management 26
6.5 Contract with a variety of materials, the relationship between the coordination of the supply unit 27
6.6 The total contract and the relationship between the coordination of government departments, 27
6.7 The total contract relationship with the surrounding residents of coordination 27