您现在的位置:主页 > 建筑工程 > 施工组织设计 > >>

泰达市民文化广场主体工程施组.doc

资料评价:
★★★☆☆
更新时间:
2010-07-04
下载要求:
注册会员
文档大小:
1.53 MB
授权方式:
共享资料
上传会员:
lajks
文档类型:
.doc
所属栏目:
施工组织设计
需要金币:
1
资料语言:
简体中文
公告:免费注册 会员可立即获得金币,更多赚取金币方法请查看:金币说明 下载地址
资料简介:

表 1 施工组织设计文字说明
第一章 综合说明···············1-16
1 施工技术能力
2 编制说明····························2-4
3 工程概况························5-12
4 施工部署·····························13-16
第二章 设备、人员动员周期和设备、人员、材料运到施工场地的方法·····17-20
1 机械设备进场计划····················17-18
2 劳动力计划··························18-19
3 材料进场计划···························19-20
第三章 主要工程项目施工方法及质量保证措施········21-77
1 测量方案·······························21-23
2 基础工程、观光通道工程施工方案及质量保证措施········24-35
3 基础排水和防止沉降措施···················36
4 地下管线、地上设施、周围建筑保护措施·······37
5 主体结构主要施工方法及质量保证措施··········38
6 装修工程施工方案·····················58-59
7 防水工程施工方案·······················60-64
8 各种管道、线路等非主体结构工程施工方法及质量保证措施·······65-75
9 采用新技术、新工艺、新材料及专利技术········76-77
第四章 管理办法及措施·······················78
1 施工进度保证措施····················78-111
2 冬雨期施工措施·····················79-83
3 施工工序协调措施····················84
4 工程项目管理办法及体系框图·········85-88
5 保证安全施工措施及体系框图·············89
6 保证工程质量管理措施及体系框图·····90-100
7 现场文明施工措施·················101
8 施工现场环保措施·····················102-103
9 施工现场维护措施·······················104
10 总包管理及服务措施························105-107
11 工程交工后服务措施·························108-111
表2 施工总平面布置图·················112
表3 主要分项工程施工工艺框图···············112
表4 施工进度计划·······················112
建虎网 http://www.jianhuw.com

泰达市民文化广场工程施工组织设计(投标)
版权所有 不得进行刻录和网络上传 2
表1·施工组织设计文字说明
第1 章:综合说明
1. 施工技术能力

Table 1 shows the construction organization design language
Consolidated statement of Chapter 1-16
1 Construction of technical capacity
2 shows the preparation of 2-4
3 Project Overview 5-12
4 Construction of the deployment of 13-16
Chapter II equipment, personnel and equipment mobilization period, personnel, materials, methods of transportation to the construction site for 17-20
A mechanical device approach plan 17-18
2 Labor plans 18-19
3 material approach plan 19-20
The third chapter, the project construction methods and quality assurance measures 21-77
A measurement program 21-23
2, engineering, tourism channel construction program and quality assurance measures 24-35
3 foundation drainage and to prevent the settlement of measures 36
4 underground pipelines, ground facilities around the construction of 37 measures of protection
5 of the main structure of the main construction methods and quality assurance measures 38
6, renovation construction schemes 58-59
7 waterproof construction program 60-64
8 various channels, the main structural lines and other non-construction methods and quality assurance measures 65-75
9 adoption of new technologies, new processes, new materials and patented technology 76-77
Management methods and measures of Chapter 78
A construction schedule to ensure measures 78-111
2 winter rain on the construction of measures 79-83
Construction process coordination measures 84 3
4 project management approach and system block diagram of 85-88
5 measures to ensure safety and system construction diagram 89
6 to ensure project quality management practices and system diagram of 90-100
Civilized construction site measures 7 101
8 construction site environmental protection measures 102-103
Construction site maintenance measures 9 104
10 Total Package management and service practices 105-107
Handing Over 11 works after the service measures 108-111
Table 2 The total construction floor plan 112
Table 3 Construction Technology major sub-diagram 112
Table 4 Construction Schedule 112
Jian Hu network http://www.jianhuw.com

Cultural Square TEDA public construction organization design (bidding)
Copyright shall not conduct burning and network upload 2
Table 1 shows the construction organization design language
Chapter 1: General Description
1. Construction of technical capacity

帮助中心 收藏 >>>
泰达市民文化广场主体工程施组下载
点击此处下载