一、 施工概况
顺驰湖畔天城位于苏州工业园区。为配合A区,10栋房屋的建造,特编制此脚手架施工组织设计。
其中A3.4.5栋为12层,总高度为36.2m, A1.2.6.7.8.9.10均为18层,大屋面标高分别为55.10(A1.2)m,58.1m(A6.10), 54.10m(A7),53.60m(A8),53.60m(A9)。标准层高均为2.9m。
二、 编制依据及说明方式
1.《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130¬—2001)
2.特殊作业人员安全技术考核管理规定(GB5306—85)
3. 《高层建筑施工手册》
4.建筑施工脚手架实用手册(含垂直运输)中国建筑工业出版社
5.项目部提供的有关图纸及资料。
三、 脚手架施工方案
A day the city of Suzhou Shunchi Lake District
Scaffolding construction organization design
1, Construction General
Shunchi Lake City is located in Suzhou Industrial Park days. In line with the A district, 10 homes were built, especially the preparation of the scaffold construction organization design.
A3.4.5 Building which is 12 floors in height of 36.2m, A1.2.6.7.8.9.10 are 18 floors, large roof elevation was 55.10 (A1.2) m, 58.1m (A6.10), 54.10m (A7), 53.60m (A8), 53.60m (A9). Standard story are 2.9m.
Second, the preparation and description method based on
1. "Steel tubular scaffolding construction safety technical specifications" (JGJ130 ¬ -2001)
2. Special operations personnel security technology assessment regulations (GB5306-85)
3. "Rise building construction manual"
4. Construction Scaffolding Practical Handbook (including the vertical transport) China Building Industry Press
5. The project to the Ministry of the drawings and information.
Third, scaffolding construction plan
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 建筑工程施工组织设计范本
- 5300次
- ***高层施工组织设计
- 1831次
- 免费高层建筑施工组织设计
- 1790次
- 小高层施工组织设计
- 1473次
- 新校区综合楼工程施工组织设计
- 1458次
- 住宅楼工程施工组织设计
- 1344次
- 一类高层建筑施工组织设计
- 1335次
- 科嘉花园小区6、8、14、16、17#楼施工
- 1291次
- 施工组织设计方案
- 972次
- 免费超高层建筑施工组织设计方案实例
- 962次