混合结构七层住宅楼基础技术交底.doc
基础技术交底
(一)工程概况 本工程是混合结构七层住宅楼,由子距垦河很近,为垦河河床腕蜒带,地基止为粉质粘土,在勘探时发现蜗牛壳,沉积年代短,地基上含水量狠高,处于饱利状态,因此地基承载能力损低,仅为90hP。,设计采用钢筋混凝土笺琴基础,混凝土强度等级为CIS,板厚为 50them,上下W.--双向配筋,均为尘皿@150,板庞标高为一巳10m,板顶为一上60m。甲单
The basis of technical disclosure
(A) Project Overview This project is a mixed structure of seven residential buildings, close by the child from the Ken river, for the Ken river bed winding wrist band, foundation only for the silty clay, and found a snail shell in the exploration, sedimentary short years, foundation ruthless high water content, in full profit status, the loss of foundation bearing capacity is low, only 90hP. The design of reinforced concrete 笺 piano foundation, concrete strength grade CIS, thickness as 50them, up and down W. - Two-way reinforcement, are dust pan @ 150, the board had a huge elevation of 10m, plate on top of a 60m. A single
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84341次
- 11g101图集全套下载
- 78883次
- cad图集大全
- 67445次
- 钢筋工程技术交底
- 1245次
- 钢结构吊装安全技术交底
- 1036次
- 砌加气砼砌块墙技术交底
- 887次
- 钢筋绑扎与安装工程技术交底
- 735次
- 钢筋混凝土预制桩打桩施工技术交底记录
- 674次
- 钢结构焊接工程技术交底
- 544次
- 钢筋混凝土预制桩施工安全技术交底
- 536次
- 单层钢结构安装工程技术交底
- 525次
- 钢结构焊接工程安全技术交底
- 524次
- 砌空心砖墙技术交底
- 521次