1、 平模存放时应满足地区条件要求的自稳角,两块大模板应采取板面对板面的存放方法,长期存放模板应将模板换成整体。大模板存放在施工楼层上,必须有可靠的防倾倒措施,不得沿外墙围边放置,应垂直于外墙存放。
2、 没有支撑或自稳角不足的大模板,要存放在专用的堆放架上,或者平堆放,不得靠在其它模板或物件上,严禁下脚滑移倾倒。
3、 模板起吊前,应检查吊装用绳索、卡具及每块模板上的吊环是否完整有效,并应先拆除一切临时支撑,经检查无误后方可起吊。模板起吊前,应将吊车的位置调整适当,做到稳起稳落,就位准确;禁止用人力般动模板,严禁模板大幅度摆动或碰倒其它模板。
4、 筒模可用拖车整体运输,也可拆成平模用拖车水平叠放运输。平模叠放时,垫木必须上下对齐,绑扎牢固。用拖车运输,车上严禁坐人。
5、 在大模板拆装区域周围,应设置围栏,并挂明显的标志牌,禁止非作业人员入内。组装平模时,应及时用卡具或花篮螺丝将相邻模板连接好,防止倾倒。
6、 全现浇结构安装作模板时,必须将悬挑担固定,位置调整准确后,方可摘钩;外模安装后,要立即穿好销杆,紧固螺栓。安装外模板的操作人员必须持好安全带。
在模板组装或拆除时,指挥拆除和挂钩人员,必须
Abstract:
1, flat-mode storage conditions should be required to meet the region from the stable angle, two large formwork panels should be taken to the storage method of the face board, long-term storage of template template should be replaced as a whole. Great template stored in the construction of floors, we must have a reliable anti-dumping measures shall be placed along the outer wall of the sides should be placed perpendicular to the wall.
2, there is no support or lack of large angle from the stable template, to be stored in a dedicated stacking shelves, or flat stacked, not leaning against other templates or objects prohibited the dumping of substandard slip.
3, before lifting the template, check the hoisting rope, fixtures and rings on every block of the template is complete and effective, and should remove all the temporary support, only after lifting by the checking is correct. Before lifting the template, the location of the cable car should be adjusted appropriately, so that from the stable steady drop, place and accurate; prohibit the use of human-like dynamic template, the template is strictly prohibited swing or pushed down by a significant other templates.
4 cylinder model available overall transport trailer, and removable into the flat die stacking with the level of the transport trailer. Stacked flat die, the skid must be aligned up and down, lashing firm. Trailer transport, take people on board is strictly prohibited.
5, dismantling a large area around the template, should be set up fences and hanging obvious signs prohibiting entry to non-operating personnel. Assembly of flat die, they shall be used fixtures or Turnbuckles connect the adjacent template to prevent dumping.
6, the whole place for the template structure installation, you must be hanging knows the weight of fixed position adjustment accurately, before uncoupling; outside the model installed, immediately put on bar sales, tightening bolts. Installed outside the template operator must hold your seat belts.
In the template assembled or dismantled, removed and linked command staff must
 