土方开挖压路机操作人员安全技术交底.doc
交底内容:
1.作业前,检查各系统管理及接头部分应无裂缝、松动和泄露现象,各紧固螺丝无松动,确认正常后方可启动。
2.变压路机前进、后退方向,应待滚轮停止滚动后进行,严禁利用换向离合器做制动用。
3.起振必须在压路机行走后进行,停振必须在压路机停车前进行,压松散路基时,应先在不振情况下压1~2遍,再用振动压实。
4. 作业后压路机应停放在坚实、平坦、安全的地方。
Cards on the table contents:
1. Work, check some of the systems management and joints should be no cracks, loose and leak phenomenon, no loosening the fastening screws, confirmed only after the normal start.
2. Variable roller forward and backward direction, wait until after the wheel stops rolling, non-use change do to the clutch brake.
3. Walk from vibrating roller to be after, stop vibration to stop before the roller, pressure loose subgrade should be the first case in the weak pressure of 1 to 2 times, then vibration compaction.
4. After the roller operation should be parked in a solid, flat, safe place.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160786次
- Autocad2013 64位32位破解版附带注册机
- 148386次
- 天正建筑8.5破解版
- 144084次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123425次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73857次
- cad图集大全
- 56939次
- 11g101图集全套下载
- 45668次
- 木工安全技术交底
- 984次
- 土方回填安全技术交底
- 957次
- 环境保护与水土保持措施
- 940次
- 钻孔灌注桩安全技术交底
- 805次
- 电焊、风割焊作业安全技术交底
- 723次
- 跨铁路工程施工安全防护措施补充方案
- 622次
- 安装避雷装置图
- 580次
- 钢筋工安全技术交底
- 557次
- 施工现场的临时照明.场内交通及水电设
- 510次
- 沥青路面沥青洒布机作业-水泥混凝土路
- 491次