电焊工程安全作业交底.doc
内容摘要:
1、 进入施工现场必须遵守南靖信达建筑工程有限公司的各项安全生产规章制度和纪律。
2、 电焊、气割,严格遵守”十不烧”规程操作。
3、 操作前应检查所有工具、电焊机、电源开关及线路是否良好,金属外壳应有安全可靠接地或接零,进出线应有完整的防护罩,进出线端应用铜接头焊牢。
4、 每台电焊机应有专用电源控制开关。开关的保险丝容量,应为该机的1.5倍,严禁用其它金属丝代替保险丝,完工后,切断电源。
5、 电气焊的弧火花点必须与氧气瓶、电石桶、乙炔瓶、木料、油类等危险物品的距离不少于10m。与易爆物品的距离不少于20m。
6、 乙炔瓶、氧气瓶均应设有安全回火防止器,橡胶管连接处须用扎头固定。
7、 氧气瓶严防沾染油脂,有油脂衣服、手套等,禁止与氧气瓶、减压阀、氧气软管接触。
8、 清除焊渣时,面部不应正对焊纹,防止焊渣溅入眼内。
9、 经常检查氧气瓶与减压阀表头处的螺纹是否滑牙,橡皮管是否漏气,焊割炬嘴和炬身有无阴塞现象。
10、注意安全用电,电线不准乱拖乱拉,电源线均应架空扎牢。
11、焊割点周围和下方应采取防火措施,并应
Abstract:
1, into the construction site must comply with Construction Co., Ltd. Nanjing Cinda all safety regulations and discipline.
2, welding, gas cutting, strictly abide by "10 does not burn," a point of order operation.
3, the operation should be checked before all the tools, welding machines, power switch and the circuit is good, metal or access should be safe and reliable ground zero, inlet and outlet should be a complete shield, inlet and outlet side application of copper weld joints.
4, each welding machine should be dedicated power control switch. Switch fuse, should be 1.5 times the machine is prohibited in other wire instead of fuses, completed, cut off the power.
5, Gas Welding arc spark point must be the oxygen bottles, drums of calcium carbide, acetylene bottle, timber, oil and other dangerous items from less than 10m. And explosive materials in the range of not less than 20m.
6, acetylene bottles, oxygen bottles should be tempered with safety devices to prevent the rubber tube connected to head office to be fixed with a bar.
7, oxygen bottles prevent contaminated oil, grease clothing, gloves, etc., prohibited and oxygen cylinders, gas regulators, oxygen hose access.
8, welding slag removal, the facial patterns should not be being welded, to prevent splashing into eyes in welding slag.
9, regular checks of oxygen cylinders and valve head office of the thread table is smooth teeth, hose leaks, welding and cutting torch nozzle and the torch body with or without vaginal plug phenomenon.
10, note that safe use of electricity, cable chaos are not allowed to drag Luanla, overhead power lines should be pitched.
11, around and below the welding point of fire protection measures should be taken and should
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160786次
- Autocad2013 64位32位破解版附带注册机
- 148386次
- 天正建筑8.5破解版
- 144084次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123425次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73856次
- cad图集大全
- 56939次
- 11g101图集全套下载
- 45666次
- 木工安全技术交底
- 984次
- 土方回填安全技术交底
- 957次
- 环境保护与水土保持措施
- 940次
- 钻孔灌注桩安全技术交底
- 805次
- 电焊、风割焊作业安全技术交底
- 723次
- 跨铁路工程施工安全防护措施补充方案
- 622次
- 安装避雷装置图
- 580次
- 钢筋工安全技术交底
- 557次
- 施工现场的临时照明.场内交通及水电设
- 510次
- 沥青路面沥青洒布机作业-水泥混凝土路
- 491次