公路工程文明施工的主要措施.doc
文明施工的主要措施
在施工中,我单位将严格按照“集中施工、快速施工、文明施工”的十二字方针,把文明施工作为施工中的一个重点,以建立安全标准化工地为文明施工目标,总结我单位在其它工程施工中取得的经验,精心组织,合理安排,做到优质施工,文明施工。
一、健全机制,明确责任
项目经理作为文明施工的组织者,对现场文明施工负全权责任。现场文明施工的直接管理由项目经理部施工技术部负责,安全质量部负责监督检查。由项目经理和相关人员组成文明施工监督小组,按照文明施工细则每周检查,并在生产调度会上通报情况,提出整改措施。
二、文明施工措施
加强全体职工职业道德的教育,制定文明施工准则。在施工组织、安全质量管理和劳动竞赛中切实体现文明施工要求,发挥文明施工在工程项目管理中的积极作用。
1、推行施工现场标准化管理。
(1)严格按照技术规范施工,按操作规程作业;随时保持现场整洁,机械停放井然有序,原材料堆码整齐,各标志、标牌齐全规范;施工便道经常洒水,防止尘土飞扬;各工点严格执行工完场清制度,废料与垃圾及不再需要的临时设施应及时
Construction of the main measures of civilization
During the construction, I units to strictly follow the "focus construction, rapid construction, civil construction," the 12-character principle, the construction of civilized construction as a priority to establish security standards for the civil construction site objectives, to conclude my unit in other the experience gained in construction, meticulously organized and reasonable arrangement, so that high-quality construction, civil construction.
A sound mechanism and a clear responsibility
As a civilized construction project manager organizer, held on-site full responsibility for the construction of civilization. The direct management of civil construction site project manager from the Ministry of Construction Ministry, the Ministry is responsible for safety and quality supervision and inspection. By the project manager and related construction supervision team composed of civilization, in accordance with the rules of civilized construction weekly inspection, and production scheduling at the briefing, proposed corrective measures.
Second, civil construction measures
Strengthening the ethics and moral education of all employees to develop guidelines for civilized construction. In the construction organization, safety and quality management and labor competition and to embody the civilized construction and requirements of the civil engineering construction project management, the active role.
1, the implementation of standardized management of the construction site.
(1) construction in strict accordance with technical specifications, follow the rules and operations; at any time to keep the scene clean, orderly parking machinery, raw materials, stack neat, all signs, sign and complete specification; construction detour regular watering to prevent dust; the engineering point of strict implementation of the complete field work clearing system, waste and rubbish and temporary facilities are no longer needed should be promptly