混凝土工程安全作业交底.doc
内容摘要:
1、 进入施工现场必须遵守安全生产有关规定。
2、 铺设车道板时,两头需搁置平稳,并用钉子固定,在车道板下面每隔1.5m需加横楞、顶撑,2m以上的高空架道,必须装有防护栏杆。
3、 车道板上应经常清扫垃圾、石子等以防行车受阻、人仰车翻。
4、 用塔吊、料斗浇捣混凝土时,指挥扶斗人员与塔吊驾驶员应密切配合,当塔吊放下料斗时,操作人员应主动避让,应随时注意料斗碰头,并应站立稳当,防止料斗碰人坠落。
5、 车道板单车行走不小于1.4m宽,双车来回不小于2.8m宽。
6、 在运料时,前后应保持一定的车距,不准奔走、抢道或超车。
7、 到终点卸料时,双手应扶牢车把卸料,严禁双手脱把,防止翻车伤人。
8、 离地面2米以上浇灌过梁、雨篷、小平台等,不准站在搭头上操作,如无可靠的安全设备时,必须戴好安全带,并扣好保险钩。
9、 使用振动机前应先检查电源电压,输电必须安装漏电开关,保护电源线路是否良好。
10、电源线不得有接头,机械运转应正常。振动机移动时不能硬拉电线,更不能在钢筋和其它锐利物上拖拉,防止割破、拉断电线而造成触电伤亡事故。
11、井架吊篮起吊或放下时,必须关好井架安全门,头、手不准伸入井架内,待吊篮停稳,方可进入吊篮内工作。
12、使用振动机的工人应手戴绝缘手套,脚穿绝缘橡胶鞋。
13、严禁酒后上班。
14、严禁安全帽放在一边不佩戴。
15、所有的工人都不得从高处向下扔掷模板、工具等物体。
16、在楼板临边倾倒混凝土浆时应注意防止混凝土浆
Abstract:
1, into the construction site must comply with safety requirements.
2, laying Drive board, the two need to hold steady, fixed with nails, at intervals of 1.5m in the Drive board need to add the following cross-leng, top support, 2m above the high-altitude aircraft Road, to be equipped with protective railings.
3, Drive board should always clean up garbage, gravel, etc. to prevent traffic disruption, Yang cars were turned.
4, with a tower crane, hopper Pouring concrete, the command pilot Fu fighting personnel should cooperate closely with the crane, when the crane down the hopper, the operator should take the initiative to avoid, should meet in the hopper at any time pay attention to, and should stand firmly in place, to prevent the hopper touch people fall.
5, Drive Plate bicycle travel is not less than 1.4m wide, two-car back and forth not less than 2.8m wide.
6, in the transport material, the front of the car should maintain a certain distance, not allowed to run, grab Road or overtaking.
7, to the end of discharge, the hands should be supporting the handlebar discharge rate, is strictly prohibited hands off to prevent rollover injuries.
8, 2 m above the ground water away from the lintel, awning, a small platform, allowed to stand head and take action, without reliable security equipment, must wear seat belts and fastened Insurance hook.
9, using the vibration machine should be preceded by checking the supply voltage, the transmission leakage switch must be installed to protect the power supply line is good.
10, the power cord may not have connectors, mechanical operation should be normal. Vibration machine can not dead lift wires move, can not in steel and other sharp objects on the drag to prevent the cut, pull power lines caused by electric shock casualties.
11, Derrick basket lifting or down, you must turn off the derrick safety gate, head, hands are not allowed to reach into derrick, pending the basket a parked to enter the basket to work.
12, using the vibration machine workers should be wearing gloves, be wearing insulated rubber shoes.
13, forbidden to work after drinking.
14, is prohibited on the side of not wearing helmets.
15, all workers shall be thrown down from a height templates, tools and other objects.
16, the floor limb should pay attention to prevent the dumping of concrete slurry concrete slurry
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160786次
- Autocad2013 64位32位破解版附带注册机
- 148386次
- 天正建筑8.5破解版
- 144084次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123425次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73857次
- cad图集大全
- 56939次
- 11g101图集全套下载
- 45667次
- 木工安全技术交底
- 984次
- 土方回填安全技术交底
- 957次
- 环境保护与水土保持措施
- 940次
- 钻孔灌注桩安全技术交底
- 805次
- 电焊、风割焊作业安全技术交底
- 723次
- 跨铁路工程施工安全防护措施补充方案
- 622次
- 安装避雷装置图
- 580次
- 钢筋工安全技术交底
- 557次
- 施工现场的临时照明.场内交通及水电设
- 510次
- 沥青路面沥青洒布机作业-水泥混凝土路
- 491次