技术交底内容:
1、 工地用电应由专职的持证电工完成。
2、 电气设备检修、停工、临时停电或下班时,要由设备操作工拉开电源并加锁。
3、 一切漏电开关、熔断器、插座均应装在配电箱内,其容量应与负荷相匹配。
4、 总配电箱除装有电源总开关及其保护电器外,还应装有各分路开关,零线要在总配电箱附近重复接地。
5、 所有楼层配电箱应采用金属箱,箱体、箱门完好无损、有锁;装在室外者要有防雨装置。
6、 导线应绝缘良好、载面符合负载要求;除不超过2M的灯位线和安全电压的线路外禁止使用花线;架空线路离楼地面3.5M以上,跨越马路应在6M以上,架空线路应采用电缆,并用硬质管保护。
7、 照明灯位一般应固定安装在工人工作时碰不着的地方;室外照明应采用防水灯头,否则应有切实的防雨装置;民工宿舍采用36伏安全电压;潮湿场所应用12伏电压。
8、 熔断丝脱扣器等保护应与负荷电流配合。
9、 所有电气设备的金属外壳均应采用接地(或接零)保护,接地电阻应符合要求;每台设备应有就近操作的开关和保护;应定期检查绝缘电阻应在0.5兆欧以上;放置室外的电气设备应有防雨。
10、 应配备一机一箱一闸一漏电保护开关,并专人专机使用。
11、如工地内设有高压配电变压器装置时
Technical disclosure content:
1, site power should be completed full-time certified electrician.
2, electrical equipment maintenance, downtime, power outages or work, we should pull the power from the equipment operator and locked.
3, all the leakage switches, fuses, sockets should be installed in the power distribution box, load capacity should be matched.
4 In addition to the main distribution box with power switch and protection of electrical things, but also with the shunt switch, the zero line is to be repeated in the main distribution box near the ground.
5, all floors should be of metal box distribution box, box, box door in good condition, with lock; installed in the outdoor unit must have the rain.
6, wires should be insulated well and meet the load requirements contained surface; addition of not more than 2M De lights voltage line and the safety of the Circuit Outside line against the use flower; overhead lines from the floor above the ground 3.5M, cross over the road should be in the 6M, overhead lines cable should be used and protected with a rigid tube.
7, lighting lights should normally be fixed on the workers at work place can no touch; outdoor lighting should be waterproof lamp, rain or devices should be effective; migrant hostels are safe voltage 36 V; damp places applied voltage of 12 volts.
8 Release fuse such protection should match with the load current.
9, all electrical equipment shall be used for grounding the metal shell (or take zero) protection, grounding resistors shall meet the requirements; each device should be close to the switching operation and protection; should regularly check the insulation resistance should be above 0.5 MΩ; place Outdoor electrical equipment shall rain.
10, should be equipped with a machine a case of a leakage of a gate protection switch, and use the hand plane.
11, such as the site is equipped with high-voltage distribution transformers device
 