安全交底内容:
1、 用机械对钢筋进行切断、调直、弯曲加工时,应按机械操作规程进行;每台机械应有单独的开关、保护、接零、接地等电气设施,并且专机专人操作。
2、 直钢筋,卡头要卡紧,地锚要结实牢固,拉筋沿线2M区域内禁止行人。
3、 绑扎立柱、墙体钢筋不得站在钢筋架上,也不得攀登骨架上下;柱筋在4M以上时应搭设工作台。
4、 起吊钢筋或钢筋骨架时,下方禁止站人;钢筋或钢筋骨架落到离楼地面1M以内时方准靠近、就位支撑好才能摘钩;多人运钢筋时,起、落、转、停动作要一致,人工上下传递不得在同一垂直线上。
5、 搬运和安装钢筋时严防钢筋碰触电源;高空作业时,应严防钢筋靠近高压线路。
6、 在楼面临时工时堆放钢筋应考虑模板及支顶的承载力,不得过分集中;新浇砼楼面未凝固前,禁止堆放钢筋。
7、 在高空安装钢筋应选好位置站稳、系好安全带。
8、 焊机必须接地良好,不准在露天雨水的环境下工作。
钢筋、工具等不应放置在外墙脚手架上,以免跌落伤人。
Security cards on the table contents:
1, were reinforced by mechanical cutting, straightening, bending, the mechanical operation procedures should be carried out; each machine should have a separate switch, protection, then zero, grounding and other electrical facilities, and operate hand plane.
2, straight bars, the first card to card tight, anchors should be strong, and stretching along the prohibited area 2M pedestrians.
3, lashing the column, not standing on the wall of reinforced steel shelves, nor skeleton climbing up and down; column should be reinforced in the erection of more than 4M table.
4, lifting steel or steel skeleton, the lower station were prohibited; steel or reinforced skeleton fell to the ground from the floor, within the time allowed to be close to 1M, in place to support good Hook; people transported reinforced when starting off, turn, action to stop the same, man must not pass up and down the same vertical line.
5, handling and installation of reinforced steel bar when the guard against the touch power; high-altitude operations, should guard against the bar near the high voltage line.
6, the floor should be considered temporary steel when stacked the top of the template and support capacity, not over-concentration; new pre-cast concrete floor hardening, prohibit stacking steel.
7, installation of reinforced high-altitude location shall be selected a firm, fasten your seat belts.
8, welder must be grounded well, are not allowed in the open water of the environment.
Steel, tools, etc. should not be placed in the external scaffold so as to avoid fall injuries.
 