室内满堂脚手架搭设工程安全作业交底.doc
内容摘要:
1、 室内满堂脚手架搭设应严格按施工组织设计要求搭设。
2、 满堂脚手架的纵、横距不应大于2m。
3、 满堂脚手架应设登高措施,保证操作人员上下安全。
4、 操作层应满铺竹笆,不得留有空洞。必须留空洞者,应设围栏保护。
5、 大型条形内脚手架,操作步层两侧,应设防护栏杆保护。
6、 满堂脚手架的步距,应控制在2m内,必须高于2m者,应有技术措施保护。
7、 满堂脚手架的稳固,应采用斜杆(剪刀撑)保护。
8、 满堂脚手架不准采用钢、竹混搭。
9、严禁操作人员在酒后进入施工现场作业。
10、每个工人进入施工现场都必须头戴安全帽。
11、班组如果因劳力不足需要再招新工人时,应事先向工地报告。
12、新工人进场后应先经过三级安全交底,并经考试合格后方可让其正式上岗。
13、新工人进场应具有四证,即:职业资质证、身份证、计划生育证和外来人口暂住证。
Abstract:
1 indoor full house Scaffolding construction organization should be strictly in accordance with design requirements erection.
2 full house scaffolding of vertical and horizontal distance of not more than 2m.
3, full house should be located climb scaffolding measures to ensure the safety of the operator up and down.
4, the operation should be fully covered layers of bamboo fence, may be left empty. Must be left empty, shall be enclosed to protect.
5, a large bar inside the scaffold, the operation step layer on both sides, should be set up protective railing protection.
6, full house steps away from the scaffolding, should be controlled within 2m, must be higher than 2m, should have technical measures to protect.
7, full house scaffolding firm, should be diagonal (scissors) protection.
8, full house are not allowed to use steel scaffolding, bamboo mashups.
9, is strictly prohibited operators in the drink to the construction site work.
10, each worker entering the construction site must be wearing helmets.
11 team if the need to move because of a labor shortage of new workers, the report shall be submitted to the site.
12, after the admission of new workers should go through three security correspondent, and pass the examination before they can let the official posts.
13, the new approach should have four cards of workers, namely: professional qualification certificate, identity cards, birth certificates and residence permits.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160786次
- Autocad2013 64位32位破解版附带注册机
- 148386次
- 天正建筑8.5破解版
- 144084次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123425次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73857次
- cad图集大全
- 56939次
- 11g101图集全套下载
- 45668次
- 木工安全技术交底
- 984次
- 土方回填安全技术交底
- 957次
- 环境保护与水土保持措施
- 940次
- 钻孔灌注桩安全技术交底
- 805次
- 电焊、风割焊作业安全技术交底
- 723次
- 跨铁路工程施工安全防护措施补充方案
- 622次
- 安装避雷装置图
- 580次
- 钢筋工安全技术交底
- 557次
- 施工现场的临时照明.场内交通及水电设
- 510次
- 沥青路面沥青洒布机作业-水泥混凝土路
- 491次