水泥砂浆楼地面工程安全作业交底.doc
内容摘要:
1、 进入施工现场必须遵守南靖信达建筑工程有限公司的各项安全生产规章制度和纪律。
2、 所有技工、小工都必须脚穿胶鞋,以免水泥浇脚。
3、 在晚上进行压光要有足够的照明,并经二级漏电照明。照明灯具应架空或用支架固定。
4、 在室内推小车时,特别是在过道中拐弯时要注意小车把挤手。人推小车把时不准倒退。
5、 清理楼地面时,清理出的垃圾杂物等,不得从窗口、阳台、井道随意向下抛掷。
6、 井架吊篮提升或下降时,必须关好井架安全门。
7、 卸料的工人其头、手不准伸入井架内,待吊篮停稳后,方能进入吊篮内工作。
8、 严禁操作人员在酒后进入施工现场作业。
9、 每个工人进入施工现场都必须头戴安全帽。
10、班组如果因劳力不足需要再招新工人时,应事先向工地报告。
11、新工人进场后应先经过三级安全交底,并经考试合格后方可让其正式上岗。
12、新工人进场应具有四证,即:职业资质证、身份证、计划生育证和外来人口暂住证。
Abstract:
1, into the construction site must comply with Construction Co., Ltd. Nanjing Cinda all safety regulations and discipline.
2, all the craftsmen, unskilled laborer must be wearing shoes to avoid foot poured concrete.
3, in the evening light pressure should be adequate lighting and illumination by the secondary leakage. Lighting should be elevated or bracket.
4, push a small car in indoor, in particular when turning in the aisle of the crowded car to pay attention to hand. When people are not allowed back into the barrow.
5, clearing the ground floor, cleaning out debris and other refuse shall not be from the window, balcony, wells and thrown down at random.
6, raise or lower the basket derrick, the derrick must be shut safety gate.
7, discharge of the workers of their head, hands are not allowed to reach into mast, pending the basket after a parked before reaching the basket to work.
8, non-operators in the drink to the construction site work.
9, each worker entering the construction site must be wearing helmets.
10 team if the need to move because of a labor shortage of new workers, the report shall be submitted to the site.
11, after the admission of new workers should go through three security correspondent, and pass the examination before they can let the official posts.
12, the new approach should have four cards of workers, namely: professional qualification certificate, identity cards, birth certificates and residence permits.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160786次
- Autocad2013 64位32位破解版附带注册机
- 148386次
- 天正建筑8.5破解版
- 144084次
- autocad2012 64位32位 破解版(附注册
- 137477次
- 天正建筑8.2破解版
- 123425次
- autocad2010免费下载(简体中文版)
- 97157次
- CAD2008注册机及使用说明
- 80847次
- 免费农村房屋设计图
- 73857次
- cad图集大全
- 56939次
- 11g101图集全套下载
- 45668次
- 木工安全技术交底
- 984次
- 土方回填安全技术交底
- 957次
- 环境保护与水土保持措施
- 940次
- 钻孔灌注桩安全技术交底
- 805次
- 电焊、风割焊作业安全技术交底
- 723次
- 跨铁路工程施工安全防护措施补充方案
- 622次
- 安装避雷装置图
- 580次
- 钢筋工安全技术交底
- 557次
- 施工现场的临时照明.场内交通及水电设
- 510次
- 沥青路面沥青洒布机作业-水泥混凝土路
- 491次