挖土工程安全作业交底.doc
内容摘要:
⒈进入现场必须遵守安全生产有关规定。
⒉挖土中发现管道、电缆及其它埋设物应及时报告,不得擅自处理。
⒊挖土时要注意土壁的稳定性,发现有裂缝及倾坍可能时,人员要立即离开并及时处理。
⒋人工挖土,前后操作人员间距离不应小于2m,堆土在1m以外并且高度不得超过1.5m。
⒌每日须检查土壁及支撑稳定情况,不得将土和其它物件堆放在支撑上,不得行走支撑下。
⒍机械挖土,启动前应先检查离合器,钢丝绳等,经空车试运转正常后再开始作业。
⒎机械操作中进铲不应过深,提升不应过猛。
⒏机械不得在输电线路下工作,在输电线路一侧工作,不论在任何情况下,机械的任何部
位与架空输电线路的距离应符合安全操作规程要求。
⒐机械应停在坚实的地基上,如基础过差,应采取走道板等加固措施,不得将挖土机履带
至基坑边距离2m内停、驶;运土汽车不宜靠近基坑平行行驶,防止坍方翻车。
⒑电缆两侧一米范围内应用人工挖掘。
⒒配合拉铲的清坡、清底工人,不准在机械回转半径下工作。
⒓向汽车上卸土应在车子停稳定后进行,禁止铲斗从汽车驾驶室上越过。
⒔基坑四周必须设置1.5m高护身栏杆,要设置一定数量的临时上下基坑用的楼梯。
⒕场内道路应及时整修,确保车辆安全畅通,各种车辆应有专人负责指挥引导。
⒖车辆进出门口的人行道下,如有地下管线、管道必须铺设厚钢板,或浇筑砼加固。
⒗在开挖杯基坑时,必须设有切实可行的排水措施,以免基坑积水,影响基坑土壤结构。
⒘基坑开挖前必须摸清基坑下的管线排列和地质开采资料,以利考虑开挖过程中应急需要。
⒙清坡、清底人员必须根据设计标高做好清底工作,不得超
Abstract:
⒈ enter the site must comply with safety requirements.
⒉ excavators found pipes, cables and other buried objects shall report, not allowed to deal with.
⒊ soil excavation should pay attention to the stability of the wall and found that cracks and crumbled possible, personnel should immediately leave and timely manner.
⒋ manual digging, after the distance between the operator should not be less than 2m, bulldozers and other than in the 1m height must not exceed 1.5m.
⒌ should be checked daily and the support wall stability of soil, soil and other items may be stacked on the support, not permitted to operate under support.
⒍ mechanical excavators, start preceded by checking the clutch, rope, etc., after commissioning of the normal empty before starting the job.
⒎ machine operations into the shovel should not be too deep to upgrade should not be excessive.
⒏ machinery shall work under the transmission line, the transmission line side of the work, whether in any case, any part of machinery
Location and distance from overhead transmission lines should be consistent with safe operation requirements.
⒐ machinery should be parked on a solid foundation, such as basic too poor to take measures to reinforce the aisle panels shall not be tracked excavators
To the pit side of the stopping distance of 2m, driving; car should not be close to the excavation of earth moving parallel to prevent the collapse overturned.
⒑ within one meter of cable on both sides of artificial excavation.
⒒ with Draglines and slope, clear the end of the workers are not allowed to work in the mechanical radius of gyration.
⒓ to dump the car should be parked in the car after the stabilization is prohibited on the bucket over the cab from the vehicle.
⒔ foundation must be set around 1.5m high railings Protection Gear to set the number of temporary and down the stairs with the Foundation.
⒕ pit road renovations in time to ensure the smooth flow of vehicle safety, all vehicles should be specifically responsible for command guidance.
⒖ vehicle access gate on the sidewalk where it is underground pipeline, pipe must be laid on thick steel plate, or pouring concrete reinforcement.
⒗ Cup in excavation pit, it must have drainage practical measures to avoid pit water, soil structure affect the foundation.
⒘ find out the pit before excavation of the pipeline under the arrangement and geological exploration data, to facilitate the emergency needs into account during the excavation.
⒙ and slope, clear bottom elevation must make clear the bottom according to the design work, shall not exceed