您现在的位置:主页 > 路桥隧道 > 安全文明 > >>

钻孔灌注桩工程安全技术交底.doc

资料评价:
★★★☆☆
更新时间:
2010-07-17
下载要求:
注册会员
文档大小:
0.01 MB
授权方式:
共享资料
上传会员:
龙龙
文档类型:
.doc
所属栏目:
安全文明
需要金币:
1
资料语言:
简体中文
资料简介:免费注册 本站会员可得金币,更多赚积分方法请查看:积分说明 下载地址

          1、 按照施工方案的要求作业。    
          2、 严格执行安全生产、消防安全、文明施工、劳动职业健康的规章制度,以及安全施工管理的有关条例,严格遵守各项施工作业的安全操作规程。    
          3、 严格遵守安全劳动的规章制度,进入施工现场必须按规定正确戴好安全帽,高空作业必须穿戴安全带,不得穿硬底鞋,施工作业应按规定穿戴劳动安全防护用品。在施工区域不准赤脚、赤膊,不准穿拖鞋、凉鞋。    
          4、 施工现场临时用电,必须按照《施工现场临时用电安全技术规程》的要求进行三相五线配电,所有用电设备必须装设漏电保护装置,要实行“一机、一闸、一漏、一箱”,电器设备及电箱应有防雨、防水措施,用电设备以及金属外壳必须接有可靠牢固的接地或(接零)保护,防止人体触电,用电安装、接线及拆卸必须由持证电工实施。    
          5、 施工机械及施工机具,必须符合安全的要求,作业前应检查机械、机具的连接罗丝、接头、滑轮、制动器、钢丝绳及电气等各部位是否正常、安全可靠方可使用,转动及传动部位应有安全防护装置,防止人体接触。    
          6、 机架要保持平衡稳定,防止倾翻,在松软地面环境下施工时,要预防地面下沉,确保施工过程及移机行走的安全,机架起吊物件时下面及周边禁止站人,严禁上下抛掷物件。    
1, in accordance with the requirements of the construction work program.
          2, strict implementation of safety production, fire safety, civil construction, labor regulations and occupational health and safety regulations relating to construction management, strict compliance with the safe operation of the construction operations.
          3, strictly observe safety rules and regulations of labor into the construction site must wear a helmet correctly according to regulations, working at height must wear seat belts, not wearing hard-soled shoes, construction work should be required to wear safety protection products. Bare feet are not allowed in the construction area, bare, not allowed to wear slippers, sandals.
          4, construction site temporary power must be in accordance with the "construction site temporary electrical safety technology" requirement for three-phase five-wire distribution, all electrical equipment must be installed leakage protection device, to implement the "one machine, a gate, a leak, a case of "electrical equipment and electrical boxes should be rain, waterproofing, electrical equipment and metal must take a firm grounding or reliable (then zero) to protect against human electric shock, electricity installation, wiring and Demolition must be implemented by the permittee electrician.
          5, construction machinery and construction equipment, must meet the safety requirements should be checked before operating the machinery, equipment connections Rose, joints, wheels, brakes, wire rope and electrical and other parts are normal, safe and reliable before use, turn and drive parts of the security guards should be to prevent human exposure.
          6, rack to maintain balance and stability and prevent tipping, in the soft ground under construction, to prevent land subsidence, to ensure the construction process and move the safety to walking, the rack when lifting objects in and around the following points were prohibited, prohibited up and down throwing objects.
 

帮助 收藏 报错 评论>>
钻孔灌注桩工程安全技术交底下载
点击此处下载